Loading...
Notice of IntentII Radio SEEDING & MULCHING 1. PERMANENT SEEDED VEGETATED COVER SHALL BE ESTABLISHED ON ALL DISTURBED SOIL SURFACES WITHIN 48 HOURS AFTER FINAL CONSTRUCTION AND CLEANUP. 2. SEED BED SHALL BE 4" OF SOIL WORKED INTO SUBBASE. 3. SIDE SLOPES SHALL NOT EXCEED 3:1. 4. MAXIMUM SIDE SLOPES IN ALL CUTS & FILLS FACING DOWN SLOPE OFFSITE SHALL BE FINISHED GRADED TO SLOPES OF NOT MORE THAN 3: 1. 5. PERMANENT SEEDING (BEFORE SEPTEMBER 15) A. LIME TO P.H. OF 6.5 ACCORDING TO SOIL TEST OR APPLY RATE OF 1001bs PER 1000 S.F.. B. APPLY 10-10-10 FERTILIZER AT 181bs PER 1000 S.F.. C. INCORPORATE LIME & FERTILIZER IN TOP 4" OF SOIL BY HARROW OR RAKE. D. SEED 1001bs PER ACRE OF THE FOLLOWING SEED MIX: a) HALES SEED Co. CONSERVATION MIX. —OR b) DEP EROSION CONTROL BMP SEED MIX No. 1. E. MULCH DISTURBED SOIL AREAS WITH HAY OR STRAW, 1-2 TONS/ACRE ANCHORED BY A SYNTHETHIC MULCH BINDER OR JUTE NETTING TACK TO SOIL OR A STRAW OR WOOD FIBRE MATRIX SANDWICH BETWEEN 2 LAYERS OF PLASTIC MESH ANCHORED TO GROUND MAY BE USED. F. HYDROSEEDING IS AN ALTERNATIVE FOR THIS APPLICATION. 6. TEMPORARY SEEDING (AFTER SEPTEMBER 15 BEFORE OCTOBER 15) A. STEPS 5A-5C. B. SEED 1201bs PER ACRE-100% PURE WINTER RYE. C. STEP 5E. D. AFTER OCTOBER 15, APPLY EXTRA HEAVY MULCH 150-2001bs PER 1000 S.F. OVER TEMPORARY SEED PER MULCH SPEC. RESEED & REMULCH IN THE SPRING. 7. TEMPORARY MULCH (OCTOBER 1—MAY 1) A. HAY OR STRAW, 150-2001bs PER 1000 S.F.. 4" DEEP ANCHOR WITH SYNTHETIC MULCH BINDER, JUTE NETTING OR TACK TO TOP SOIL. B. BARK & COMPOST OR WOOD CHIPS: 500-9001bs PER 1000 S.F. 8" TO 12" DEEP, APPLIED WITH 10Ibs NITROGEN FERTILIZER PER TON OF MULCH USED. FACE OF FABRIC STAPLED TO STAKES ENVIROFENCE BY MIRAFI, INC., OR APPROVED EQUAL O INSTALLED AT TOE OF ANY DISTURBED SLOPE OR LIMITS OF CONSTRUCTION, TYP. dI- i FLOW �s 4" x 4" TRENCH WITH z UNDISTURBED SUBGRADE COMPACTED BACKFILL. /\4/' 00 3"— NOTES: 1. SILTATION FENCE SHALL BE "ENVIROFENCE" AS MANUFACTURED BY MIRAFI, INC. OR AN APPROVED EQUAL. 2. SILTATION FENCING SHALL BE INSTALLED DOWNSLOPE OF ALL PROPOSED AND EXISTING DISTURBED AREAS, OR AS SHOWN ON THE PLANS. 3. EROSION CONTROL MEASURES SHALL BE MAINTAINED UNTIL VEGETATIVE OR STABILIZED COVER HAS BEEN FIRMLY ESTABLISHED. 4. EROSION CONTROL MEASURES SHALL FOLLOW THE PERFORMANCE STANDARDS OF THE USDA SOIL CONSERVATION SERVICE, AND ANY APPLICABLE STATE/LOCAL CONSERVATION AUTHORITY. SILTATION FENCE DETAIL N.T.S. EROSION CONTROL NOTES: 1. THE SITE CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING AND MAINTAINING SUITABLE EROSION AND SEDIMENTATION CONTROL DEVICES ON SITE DURING CONSTRUCTION AS REQUIRED TO PREVENT SILT FROM LEAVING THE SITE. SILT WILL NOT BE ALLOWED BEYOND CONSTRUCTION LIMITS. ADDITIONAL PROTECTION: ON —SITE PROTECTION MUST BE PROVIDED THAT WILL NOT PERMIT SILT TO LEAVE THE PROJECT CONFINES DUE TO UNFORSEEN CONDITIONS OR ACCIDENTS. 2. EROSION CONTROL MEASURES SHALL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLANS DOES NOT PROVIDE SUFFICIENT EROSION AND SEDIMENT CONTROL, ADDITIONAL CONTROL MEASURES SHALL BE IMPLEMENTED. CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR REPLACING EROSION CONTROL DEVICES WHICH BECOME INEFFECTIVE. 3. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS FOR ALL GRADING AND OTHER LAND DISTURBING ACTIVITIES PRIOR TO CONSTRUCTION. 4. THE CONTRACTOR IS RESPONSIBLE FOR THE CLEANUP AND REMOVAL OF ANY BUILDUP OF SEDIMENT WHICH ESCAPES FROM THE SITE. 5. CONTRACTOR IS RESPONSIBLE FOR CLEANING SILT AND DEBRIS OUT OF ALL STORM DRAINAGE STRUCTURES UPON THE COMPLETION OF CONSTRUCTION. 6. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL TEMPORARY EROSION CONTROL MEASURES AFTER CONSTRUCTION IS COMPLETE AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. 7. THE CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ANY FINES LEVIED AGAINST THE SITE FOR VIOLATIONS OF EROSION CONTROL REGULATIONS. 8. CONTRACTOR SHALL PROVIDE TEMPORARY GROUND COVER FOR ALL AREAS WITH EXPOSED SOIL WHICH WILL NOT BE DISTURBED BY GRADING OPERATIONS FOR A PERIOD OF THIRTY DAYS OR MORE. 9. IF WORK ON THIS PROJECT IS SUSPENDED FOR ANY REASON, THE CONTRACTOR SHALL MAINTAIN THE SOIL EROSION AND SEDIMENTATION CONTROL FACILITIES IN GOOD CONDITION DURING THE SUSPENSION OF WORK. 10. SPRINKLE OR APPLY DUST SUPPRESSORS TO KEEP DUST WITHIN TOLERABLE LIMITS AT THE CONSTRUCTION SITE. MISHAUM POINT ROAD 'x24, 100.50 .T IETAIL) HMARK EC. MANHOLE ) Al2 �J I \•-:a sellers i 8` :• NOTES: ZONED: SINGLE RESIDENCE SETBACK FRONT=60' SETBACK SIDE & REAR=20' <\+tot)nd Hill . .. + LOCUS MAP 1 "=2083 LLj Ln U > as w o �cc z 0 c> "ATTENTION: THE WORK PROPOSED ON THIS PLAN IS ALLOWED BY AN ORDER OF CONDITIONS AND WETLAND PERMIT ISSUED BY THE DARTMOUTH CONSERVATION COMMISSION WHICH INCLUDED STRICT CONDITIONS AND REQUIREMENTS. NO WORK IS TO PROCEED UNTIL THE CONTRACTOR HAS REVIEWED THE ORDER OF CONDITIONS AND AGREED TO ABIDE BY ALL CONDITIONS THEREIN, AND VERIFIED THAT THE PLAN REVISION DATES SPECIFIED ON THE ORDER OF CONDITIONS MATCH THE DRAWINGS SUPPLIED TO THE CONTRACTOR FOR CONSTRUCTION." • 30 a• 120 J� > w o' 0 N 0 O U 3 ^ to I II N O } e I m F- >1 U m 0 o 0 Y Z W W Fw Q M Q (I- x O 0 0 U V) r m 0 w O of a a- • (n o w w U iE 0 ydw E p L O p w Z W -t o Ln (D q, 8 w N O C a� V p=ui 0 )1 I won, 171 J $ w z z 5 z v pt(5F s w Q V Z V N� W x 0 Nnw��a w X z W a s Wa_ Q a-' �wzV VN �a�� VuZZLLz z Ld �23 6 W I 00 N O�d0�r5w Z (O'c Z ~ (O a) Z p p T z W I ?¢ �z ZLW� p�w O z j Z y o u `� N a wddo W W w 2 = � LL /\1a- Z Z p Q Z 00 O Z Q Ocp w}} w • O (p g } W V V Q LLI I— � w €omN ¢ Wx (1 VV S`o W a a D W 0 1 0 }- F- Z Q Z o o W (A vi 0 Z o Lu U — L� Z Q w Q of 0 WoL o F— U 0 ° o IZ Q 0 Z 0 z 0 J x D x 0 U) m N N M 7 JOB NO.: 10-7632 1 H:\CAF PRAWNC5\2010 IIRAWINCS\I0-7632(Austm aper)l10-7632\dag\N0I nm.day