Loading...
Zoning ReviewSOIL DATA DESIGN DATA 2' 5' 34' 58' DATE: SEPT.11,1997 PERFORMED BY: RICHARD ALVES WITNESSED BY: CHRIST❑PHER MICHAUD n. TP-#118 Al 7 n. TP-#119 TP-#120 '0' LAYER 'A' LAYER SANDY LOAM lOYR 3/2 'B' LAYER SANDY LOAM IOYR 5/G 'Cl' LAYER V.F. SANDY LOAM 2.5Y G/3 'C2' LAYER MED. LOAMY SAND 2.5Y 5/3 51.5 2' 81.3 5' 78.q 32 7G.q 48' '0' LAYER 'O' LAYER 'A' LAYER 'A' LAYER SANDY LOAM SANDY LOAM lOYR 3/2 lOYR 3/2 'B' LAYER SANDY LOAM SANDY LOAM lOYR 5/G 10YR 5/G 'Cl' LAYER 'Cl' LAYER V.F. SANDY LOAM V.F. SANDY LOAM 2.5Y G/3 2.5Y G/3 'C2' LAYER 'C2' LAYER MED. LOAMY SAND MED. LOAMY SAND 2.5Y 5/3 2.5Y 5/3 I nOL -1 79 7 q6' 1 74.1 PERG AT 5G' PERG AT GO' RATE, 1' In 8 min. RATEl 1' In 10 min. MOTTLES AT 32' C7q.0) MOTTLES AT 3G' (7q.1) LEGEND --- 81.q 2' 81.7 G' 79.4 32' 78.1 38' 81.7 81.4 79.2 78.7 96' 73.9 MOTTLES AT 32' C7q.2) too EXISTING CONTOUR PROPOSED CONTOUR PPIPE INVERT ELEVATION TEST PIT 0 SEPTIC TANK ❑ DISTRIBUTION BOX W PROPOSED WATER SERVICE LINE V OBSERVED GROUNDWATER TABLE ELEVATION RESERVE AREA 3, 5' DIA. 5"dio. outlet 1" toper 5-4" 30.5" 18.5" 7.5' TOP VIEW END VIEW 5, 5' DIA. OUTLETS CROSS SECTION VIEW DISTRIBUTION BOX NOT TO SCALE L 10'-6" PLAN VIEW CROSS SECTION VIEW SEPTIC TANK NOT TO SCALE 3.5"dia. knockouts inlet EARTH BACKFILL \\ 4 oD 0° c 0 C) O 0 0° 00 00 a 00 ° � a0 �o 0 O0 Op ° a 0 O 00 o °° a 04Co a 0 0 v ° °° ° v° 'd ° d v° v ° v d ° v v d °° h°v v v vd °d ° v v° v v vd v d dvd v°° d° ° °° ° o o e Cs° o d v° v vd ° d v v° v v v v v vd v ° o°° o° - v° v° v v DESIGN PERG RATE: V IN 10 min. DE51GN FLOW: 4 BEDROOMS X 110 GPD/BDM = 440 GPD REQUIRED 12' MIN. EARTH SYSTEM DESIGN: U5E 50' LONG X 18' LEACHING BED 12" BACKFILL BOTTOMS 50' LONG X 18' WIDE X 0.GO G/5F 540 GPD PROVIDED - 2' DEPTH OF 1/8' - 2' 1/2' WASHED PEA5TONE 10' DEPTH OF 3/4' TO 10' 1-1/2' WASHED GRU5HED STONE TYPICAL LEAC�tING FIELD GROSS SECTION ESTATE LOT 26 NOT TO SCALE AREA=240.567 SF .. � C5 52 A(;RFc,� PROPD \ \ \ \ \ WELL \ \ 1 \ \ \ \\\ \ PR\UP05E \\ ` \, \�WATE$ 5ERVIs E 4� 1 L \ \ PROPOSED � W , \ 24'X24' 4 BEDROOM FAMILY \ GARAGE ® 40 �! I / `\ DWELLING ROOM ® ® TP#120 J \ .O.C.=q5.5 \ ® i - \ LIMIT OF / 0 84 \ \ \ 10\ \ \ \ EXCAVATION \ \ m � 5 TYPICAL � \ \ \ P#llq TP#1 8 \ \ �17 84 62 \ l N BENGtiMARK= TOP OF 1 \ \ \ \ i SPIKE ELEV. 85.8'' 4G•20`\ \� \ i 50' CD �yrssYrri:Fws�ossd �rvaax ��eaaaa�vo� j / NOTES: 1. THIS LOT IS PART OF AN APPROVAL NOT REQUIRED SUBDIVISION PREPARED FOR ALLAN SCHELL et al LOGATED ON DIVISION ROAD. DWELLING / /' 2. THE LOT 15 LOCATED IN A SINGLE RE5IDENGE / B C5R-13) ZONING DISTRIGT. t ZONING REQUIREMENTS (MINIMUM) AREA 240,000 SF C1G0,000 CONTIGUOUS UPLAND) FRONT YARD SETBACK 60 FT 51DE YARD 5ETBAGK 20 FT ,p REAR YARD 5ETBAGK 20 FT 0 GENERAL NOTES N 1) THIS SYSTEM SHALL BE INSPECTED WHEN LEACHING AREA 15 FULLY EXCAVATED AND WHEN ALL COMPONENTS ARE IN PLACE. WHEN THE SYSTEM IS READY FOR INSPECTION, THE CONTRACTOR SHALL NOTIFY THE LOCAL BOARD OF HEALTH. 2) WASHED CRUSHED STONE SHALL BE FREE OF ALL DIRT. DUST AND FINES. 3) ALL ELEVATIONS ARE BASED ON A55UMED ELEVATION DATUM. 4) HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO OPERATE OVER THE LIMITS OF THE SEWAGE DISPOSAL SYSTEM DURING THE COURSE OF CONSTRUCTION. 5) NO FIELD MODIFICATIONS TO THE SEWAGE DISPOSAL SYSTEM SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL OF THE ENGINEER AND THE LOCAL BOARD OF HEALTH. G) UNLESS OTHERWISE NOTED ALL SYSTEM COMPONENTS SHALL BE INSTALLED IN ACCORDANCE WITH TITLE V OF THE STATE ENVIRONMENTAL CODE AND ANY APPLICABLE LOCAL REGULATIONS. 7.) SEPTIC TANK. DISTRIBUTION BOX. ETC. SHALL BE MANUFACTURED BY A. ROTONDO + SONS OR APPROVED EQUAL. 8) GROUT TO BE USED AT ALL POINTS WHERE PIPES ENTER OR LEAVE ALL CONCRETE STRUCTURES IN ORDER TO PROVIDE A WATERTIGHT SEAL. °) ALL 5HIPLAP JOINTS IN THE SEPTIC TANK SHALL BE SEALED WITH NEOPRENE GASKETS OR ASPHALT CEMENT. 10) EXCAVATE ALL UNSUITABLE MATERIAL IN LEACHING AREA AND BACKFILL WITH CLEAN GRAVEL AND COARSE SAND. 11) THIS 5Y5TEM 15 NOT DESIGNED FOR A GARBAGE DI51`05AL UNIT. New Bedford City Rifle Ra ,GcReys Corner LOCUS ACNER S th Wes t POTTERS us Its Is WAY SLADES LANE P et River SLA1)E$ CODER best I ook Stades Corner PLOT PLAN 3. THIS LOT IS LOCATED IN A FIRM ZONE G . TOP OF - FOUNDATION -j;. FINISH GRADE 4. PER GENT LOT COVERAGE: 27. VICINITY �IAP ELEV.= g5.50 ELEV. = 94.50 SCALE: 1 =40 5. REQUIRED PARKING SPACES PROVIDED IN GARAGE. FINISH GRADE EL.=85.0 54.. , T ' SLAB ELEV.= 5' 5` 87 8 1500 GALLON 87.83 REINF❑RCED CONCRETE 4 7 84,10 _ ° ° 83.70 4'-6" SEPTIC TANK 84.00 87.63 DISTRIBUTI❑N ° v 3i4'-1 1/2' WASHED 87.38 ° ° STONE BOX ° v v 1 ° ° 83.20 LEVEL STABLE BAS 3" LIMIT OF EXCAVATION 77.0 5EA50NAL HIGH GROUNDWATER ELEV.= 79.2 SYSTEM PROFILE BOARD OF PEALTP STAMPS ■��Ay.y�.�`�' q Wir A� � �'�� � °MOUTH @@tea .mac d t was Le r eoi crv*ox By BOARD OF HEALTP STAMPS I P.E. STAMP SUBSURFACE SEWAGE DISPOSAL SYSTEM .� OWNER: MARIA GORDON �°' I�" -.4, 1 ; ASSESSORS MAP + LOT: ESTATE LOT #213 o 321 6STREET LOCATION: OFF SLADES FARM LANE o� 0! TSB ENGINEERING FIRM: P.L.S. STAMP SITEC, Inc. P E C a i V E D 13 Welby Road k9E1124C New Bedford, MA 02 5 (508) 998-2125 OCT 7199T Civil. and Environmental Engineering FAX (508) 998-7554 Land Use Planning DATE: SEPTEMBER 23, 19g7 � -oaf �I�FHF --- EIIARD IHEALTN CONTACT PERSON: BRIAN LEVESQUE. ACAD NO. TFILE NO, --1 7 i