Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
BP-75778
�11111111111 �IUITTTTffn 13.26kW PV SYSTEM 2 WOODBURY LANE N. DARTMOUTH, MA 02747 L LL" WOODBURY LANE MCI N Y VICINITY MAP _SITE L.kSCALE- NTS SHEET INDEX GENERAL NOTES GENERAL NOTES CONTINUED GENERAL NOTES CONTINUED ABBREVIATIONS CONTINUED 1.. THE INSTALLATION CONTRACTOR IS 8. THE DC VOLTAGE FROM THE PANELS IS 14. B) CURRENT PREVAILING UTILITY JB JUNCTION BOX PV-1 COVER SHEET W/ SITE INFO & NOTES RESPONSIBLE FOR INSTALLING ALL ALWAYS PRESENT AT THE DC COMPANY SPECIFICATIONS, kCMIL THOUSAND CIRCULAR MILS EQUIPMENT AND FOLLOWING ALL DISCONNECT ENCLOSURE AND THE DC STANDARDS, AND REQUIREMENTS - kVA KILO-VOLTAMPERE PV-2 ROOF PLAN W/ MODULE LOCATIONS DIRECTIONS AND INSTRUCTIONS TERMINALS OF THE INVERTER DURING 15 THIS SET OF PLANS HAVE BEEN kW KILO -WATT CONTAINED IN THE DRAWING PACKAGE AND INFORMATION RECEIVED FROM TRINITY DAYLIGHT HOURS. ALL PERSONS W PREPARED FOR THE PURPOSE OF kWH KILO -WATT HOUR L LINE PV-3 ELECTRICAL 3 LINE DIAGRAM 2. THE INSTALLATION CONTRACTOR IS ORKING ON OR INVOLVED WITH THE PHOTOVOLTAIC SYSTEM ARE WARNED MUNICIPAL AND AGENCY REVIEW AND APPROVAL. THIS SET OF PLANS SHALL MCB MAIN CIRCUIT BREAKER RESPONSIBLE FOR INSTALLING ALL THAT THE SOLAR MODULES ARE NOT BE UTILIZED AS CONSTRUCTION MOP MAIN DISTRIBUTION PANEL EQUIPMENT AND FOLLOWING ALL ENERGIZED WHENEVER THEY ARE DRAWINGS UNTIL REVISED TO INDICATE MLO MAIN LUG ONLY DIRECTIONS AND INSTRUCTION CONTAINED EXPOSED TO. LIGHT.. 'ISSUED FOR CONSTRUCTION'. MTD MOUNTED IN THE COMPLETE MANUAL. - 9. ALL PORTIONS OF THIS SOLAR 16 ALL INFORMATION SHOWN MUST BE MTG MOUNTING 3. THE INSTALLATION CONTRACTOR IS PHOTOVOLTAIC SYSTEM SHALL BE CERTIFIED PRIOR TO USE FOR N NEUTRAL RESPONSIBLE FOR READING AND, MARKED CLEARLY IN ACCORDANCE WITH CONSTRUCTION ACTIVITIES. NEC NATIONAL ELECTRICAL CODE UNDERSTANDING ALL DRAWINGS, THE NATIONAL ELECTRIC CODE ARTICLE - NIC NOT IN CONTRACT COMPONENT AND INVERTER MANUALS 690. NO # NUMBER PRIOR. TO INSTALLATION. THE INSTALLATION 10.. PRIOR TO THE INSTALLATION OF THIS ABBREVIATIONS NTS NOT TO SCALE CONTRACTOR IS ALSO REQUIRED TO HAVE PHOTOVOLTAIC SYSTEM, THE OCP OVER CURRENT PROTECTION ALL COMPONENT SWITCHES IN THE OFF INSTALLATION CONTRACTOR SHALL AMP AMPERE p POI POSITION AND FUSES REMOVED PRIOR TO ATTEND A PRE-INSTALLTION MEETING AC ALTERNATING CURRENT PB .PULL BOX THE INSTALLATION OF ALL FUSES BEARING FOR THE REVIEW OF THE INSTALLATION AL ALUMINUM PH ID PHASE SYSTEM COMPONENTS. PROCEDURES, SCHEDULES, SAFETY AND AF AMP. FRAME PVC POLY -VINYL CHLORIDE CONDUIT 4. ONCE THE PHOTOVOLTAIC MODULES ARE COORDINATION. AFF ABOVE FINISHED FLOOR PWR POWER MOUNTED, THE INSTALLATION - 11. PRIOR TO THE SYSTEM START UP THE AEG ABOVE FINISHED GRADE QTY QUANTITY CONTRACTOR SHOULD HAVE A MINIMUM OF INSTALLATION CONTRACTOR SHALL AWG AMERICAN WIRE GAUGE RGS RIGID GALVANIZED STEEL ONE ELECTRICIAN WHO HAS ATTENDED A ASSIST IN PERFORMING ALL INITIAL C CONDUIT ( GENERIC TERM OF SN SOLID NEUTRAL SOLAR PHOTOVOLTAIC INSTALLATION HARDWARE CHECKS AND DC WIRING RACEWAY, PROVIDE AS JSWBD SWITCHBOARD COURSE ON SITE. CONDUCTIVITY CHECKS. SPECIFIED) TYP TYPICAL 5. FOR SAFETY, IT IS RECOMMENDED BY THE 12. FOR THE PROPER MAINTENANCE AND CB COMBINER BOX U.O.I. UNLESS OTHERWISE INDICATED MANUFACTURE THAT THE INSTALLATION ISOLATION OF THE INVERTS REFER TO CKT CIRCUIT WE, WEATHERPROOF CREW ALWAYS HAVE A MINIMUM OF TWO THE ISOLATION PROCEDURES IN THE CT CURRENT TRANSFORMER. XFMR TRANSFORMER PERSONS WORKING TOGETHER AND THAT OPERATION MANUAL. CU COPPER +72 MOUNT 72 INCHES TO BOTTOM - EACH OF THE INSTALLATION CREW 13. THE LOCATION OF PROPOSED ELECTRIC DC DIRECTCURRENT OF ABOVE FINISHED FLOOR OR MEMBERS BE TRAINED IN FIRST AID AND AND TELEPHONE UTILITIES ARE SUBJECT DISC DISCONNECT SWITCH GRADE CPR. TO FINAL APPROVAL OF THE DWG DRAWING 6. THIS SOLAR PHOTOVOLTAIC SYSTEM IS TO APPROPRIATE UTILITY COMPANIES AND EC ELECTRICAL SYSTEM INSTALLER BE INSTALLED FOLLOWING THE. OWNERS. EMT ELECTRICAL METALLIC TUBING CONVENTIONS OF THE NATIONAL ELECTRIC 14. ALL MATERIALS, WORKMANSHIP AND FS FUSIBLE. SWITCH CODE. ANY LOCAL CODE WHICH MAY CONSTRUCTION FOR THE SITE FU FUSE SUPERSEDE THE NEC SHALL GOVERN. - IMPROVEMENTS SHOWN HEREIN SHALL GND GFI GROUND /7.. ALL SYSTEM COMPONENTS TO BE BE IN ACCORDANCE WITH: GROUND FAULT INTERRUPTER INSTALLED WITH THIS SYSTEM ARE TO BE A) CURRENT PREVAILING MUNICIPAL HZ FREQUENCY ( CYCLES PER. "UL" LISTED. ALL EQUIPMENT WILL BE NEMA AND/OR COUNTY SPECIFICATIONS, SECOND) 3R OUTDOOR RATED UNLESS INDOORS. STANDARDS AND REQUIREMENTS GENERAL NOTES IF ISSUED DRAWING IS MARKED WITH A REVISION CHARACTER OTHER THAN "A", PLEASE BE ADVISED THAT FINAL EQUIPMENT AND/OR SYSTEM CHARACTERISTICS ARE SUBJECT TO CHANGE DUE TO AVAILABLITY OF EQUIPMENT. Engineer / License Haiider: Issuea / Kevlslons; PS ISSUED TO TOWNSHIP FOR PE-rr 11/4/2014 NO. DESCRIPTION DATE Project Title: LOPES, CARLOS TRINITY ACCT #: 2013-24W42 Project Address: 2 WOODBURY LANI} N. DARTMOUTH, MA OZ747 Drawing Title: PROPOSED 13.26MAII SOLAR SYSTEM Drawing Information DRAWING DATE: 11/4/2014' DRAWN BY: DMR REVISED BY: TOTAL SYSTEM SIZE: 13.26kW TOTAL MODULE COUNT: 52 MODULES USED: CANADIAN'SSOLAR 255 MODULE SPEC#: CS6P-255P, UTILITYCOMPANY: NSTAR UTILITY ACCT #: _ UTILITY METER #: 1551311 DEALTYPE Rev. No. Sheet P1 Pv - 1 S 0 L A K' 2211 Allenwood Road R777-797-2978 Wall, New Jersey07719 www.Trir.hrty-Solar.mm QATTACHIVIENT &CLIP DETAIL SCALE: NOTTO SCALE NEW PV SOLAR MODULE, TYPICAL UNIRAC CLAMP ( REFER TO EQUIPMENT SCHEDULE (SEE SPEC SHEET FOR DETAILS) FOR SPECS AND QUANTITIES) NEW MOUNTING FOOT/ ATTACHMENT SOLAR MODULE SOLAR MODULE POINTS, TYPICAL ( REFER TO ENGINEERING LETTER FOR SPACING AND DETAILS) X UNIRAC SOLAR MOUNT BEAM (SEE SPEC SHEET FOR DETAILS) NEWUNIRAC RAIL,TYPICAL 2 UNIRAC "L" FOOT ( REFER TO THE UNIRAC ( SEE SPEC SHEET FOR DETAILS) ONE LAYER ASPHALT SHINGLES CODE -COMPLIANT INSTALLATION SUNMODO FLASHING ENGINEERS LETTER FOR SPECS MANUAL FOR SPECS AND DETAILS) (.SEE SPEC SHEET FOR DETAILS) APOC SEALANT NEW END CLIP, TYPICAL ( SEE SPECS EET FOR DETAILS) ( REFER TO THE UNIRAC CODE -COMPLIANT INSTALLATION MANUAL 3.2.5 FOR SPECS AND =ENGINEERS DETAILS) NEW MID CLIP, TYPICAL ECIFICATION ( REFER TO THEUNIRAC CODE -COMPLIANT INSTALLATION MANUAL 3.2.5 FOR SPECS AND DETAILS) nPV MODULE ATTACHMENT ON ASPHALT SHINGLE ROOF SCALE: NOT TO SCALE ID1) UTILITY METER LOCATED AT END OF DRIVEWAY BACK FRONT SOLAR MODULES SHALL NOT EXCEED PEAK HEIGHT. 3UEIGHT FROM GROUND LEVEL TO PEAK OF ROOF SCALE: NOT TO SCALE ME ) NOTES: 1.) ALL EQU IPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 2.) ALL OUTDOOR EQUIPMENT SHALL BE RAIN TIGHT WITH MINIMUM NEMA 3R RATING. L- 3.) ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION. - 4.) ALL EQUIPMENT -.INSTALLED OUTDOORS SHALL HAVE A NEMA 3 RATING _ 5.) ROOFTOP SOLAR INSTALLATION ONLY PV ARRAY WILL NOT EXTEND BEYOND THE EXISTING BUILDING ENVELOPE ARRAY SCHEDULE SYMBOL LEGEND PLUMBING SCHEDULE EQUIPMENT SCHEDULE RI INDICATES ROOF DESIGNATION, REFER TO INDICATES NEW UTILITY DISCONNECT TO BE NEW END CLIP,. TYPICAL ( REFER TO THE UNIRAC CITY SPEC # ARRAY ORIENTATION = 107.2° R� ARRAY SCHEDULE FOR MORE INFORMATION a .INSTALLED OUTSIDE CODE -COMPLIANT INSTALLATION MANUAL MODULE PITCH = 3Zm SECTION 3.2.5 FOR SPECS AND DETAILS) 52 CANADIAN SOLAR 255 (CS6P-255P) R2 III,:INDICATES NEW PV SOLAR MODULE. RED MODULES NEW MID CLIP, TYPICAL ( REFER T0. THE UNIRAC 1 SE1140OA-US ARRAY ORIENTATION 197.2°� INDICATES EXISTING METER LOCATION INDICATE PANELS THAT USE MICRO INVERTERS. ® CODE -COMPLIANT INSTALLATION MANUAL MODULE PITCH = 3Z,- LJ REFER TO EQUIPMENT SCHEDULE FOR SPECS. SECTION 3.2.5 FOR SPECS AND DETAILS)OTHER OBSTRUCTIONS R3 - NEW UNIRAC RAIL,TYPICAL ARRAY ORIENTATION = 107.2° EP INDICATES EXISTING ELECTRICAL PANEL INDICATES NEW PRODUCTION METER TO BE -- MODULE PITCH =320 LOCATION: IN BASEMENT P INSTALLED IN BASEMENT. — I REFER TO THE UNIRAC CODE -COMPLIANT INSTALLATION MANUAL FOR SPECS AND DETAILS) R4 INDICATES PLUMBING DESIGNATION. REFER TO INDICATES NEW INVERTER TO BE NEW MOUNTING FOOT/ ATTACHMENT POINTS, ARRAY E PITCH ORIENTATION 19Z2° A ® INSTALLED IN BASEMENT. TYPICAL ( REFER TO ENGINEERING LETTER FOR MODULE PITCH =ION PLUMBING SCHEDULE FOR. DETAILS AC REFER TO EQUIPMENT SCHEDULE FOR SPECS, li SPACING AND DETAILS) Engineer / License Holder: Issued / Revisions k PI ISSUED TO TOWNSHIP FOR PERMR 11/4/20194 NO. DESCRIPTION DATEE Project Title: LOPES, CARLOS i TRINITY ACCT #: 2013-24542 Project Address: `I 2 WOODBURY LANE N. DARTMOUTH, MA 02747 i Drawing Title: PROPOSED 13.26kW SOLAR SYSTEM Drawing Information DRAWING DATE: 11/4/2014 DRAWN BY: DMR REVISED BY: System Information: TOTAL SYSTEM SIZE: 13.26kW TOTAL MODULE COUNT: 52 MODULES USED: CANADIAN SOLAR 255 MODULE SPEC#: CS6P-255P UTIUTYCOMPANY: NSTAR UTILITYACCT#: UTILITY METER#: 1551311 DEALTYPE: Rev. No. Sheet P1 PVn1l-2 ®tv SOLAR 2211 Allenwood Road 577-797-2978, Wall, New Jersey07719 www.Trinity-Solar.com, ------ (A MOUNTED TO ROOF ----- SOLAR MODULES MOUNTED TO ROOF ON 4 ARRAYS 52 - 255W MODULES W/ 1 SOLAR EDGE P300 PER MODULE UNDER SOLAR MODULENEC 690.34 18.75 ADC MAX PER STRING — 0 8"x8' 25TRINGSOFI$MODULES INSERIES-350Vmax --------�------------------w _ _----_.._----,.,.----_„„,,,,.- -.-_- t- ._-....® _ METAL _ _ 1 STRING OF 16 MODULES IN SERIES- 350 Vn1ax C. *3 STRINGS TO BE TERMINATED IN PARALLEL INSIDE COMBINER BOX BOX JUNCTION ------ —W-- D EXI STI N G 120/240V UTILITY METER 19 240V 10 200A MAIN BREAKER 200A BUSBAR ARRAY CIRCUIT WIRING NOTES COMPLIES WITH 2O11 NEC 1.) LOWEST EXPECTED AMBIENT TEMPERATURE BASED ON )2p200A ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO - INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT - TEMP = -16'C - 2.) HICHIIEST CONTINUOUS AMBIENT TEMPERATURE BASED _ ON AS( "RAE HIGHEST MONTH 2% DRY BULB - TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO -_ INSTALLATION LOCATION, HIGHEST CONTINUOUS TEMP = 33'C __ 3-) 2005 ASHRAE FUNDAMENTALS 2% DESIGN G TEMPERATURES DO NOT EXCEED 4TC IN THE UNITED F'- STATES'(PALM SPRINGS, CA IS 44.1'C). FOR LESS THAN a 9 CURRENT -CARRYING CONDUCTORS IN A EXISTING MAIN BREAKER LOAD ROOF -MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE _ CENTER INSULATED LINE TAPS ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE I INSTALLED ON MAIN FEEDERS OF 47-C OR LESS (ALL OF UNITED STATES), T NEC 690.64 4.) PHOTOVOLTAIC POWER SYSTEMS SHALL BE PERMIT-ED TO OPERATE WITH UNGROUNDED PHOTOVOLTAIC SOURCE AND OUTPUT CIRCUIT AS PER NEC 690.35 5.) ALL 'EQUIPMENT INSTALLED OUTDOORS SHALL HAVE A NEMA 3 RATING. CALCULATIONS FOR CURRENT CARRYING CONDUCTORS REQUIRED CONDUCTOR AMPACITY PER STRING (NEC6SO.S(B)(1)]: (15.00*1.25)3 = 5625A AWG #ff. DERATED AMPACITY AMBIENT TEMP: 55 C, TEMP DERATING FACTOR: .76 RACEWAY DERATING = 2 CCC: 1.00 (75*.76�1.00 = 57.00A ' 57.00A 1 56.25A, THEREFORE WIRE SIZE IS VALID TOTAL AC REQUIRED CONDUCTOR AMPACITY 48.00A*11.25 = 60.00A AWG {6, DERATED AMPACITY AMBIENT TEMP: 30C, TEMP DERATING: 1.0 RACEWAY DERATING S 3 CCC: N/A 75A*1.0 = 75A 75A'_ 514.00A, THEREFORE AC WIRE SIZE IS VALID CALCULATION FOR PV OVERCURRENT PROTECTION TOTAL INVERTER CURRENT: 48.00A 48.0OA*1.25 = 60.00A O rSCURRENT PROTECIIVN IJ VALIU PV MODULE SPECIFICATIONS CANADIAN SOLAR 255(CS6P-255P) Imp 8.43 Vmp 30.2 Voc 37.4 Isc 9 INVERTER #1- SE1140OA-US DC AC Imp 35 Pout 11400 Vmp 350 ]out 48 Voc 500 [max. 160 Isc 45 Vnom 240 60A DISCONNECT FUSED W/ 60A FUSES GROUPED W/ MAIN BREAKER LOAD CENTER SQUARE D PN: D222N saaag:�� PRODUCTION 11 M COMBINER 60A UNFUSED UTILITY DISCONNECT W SQUARE D PN: D222RB INVERTER #1 _-- + i d I" L1 L2 N i 0-- II oe0 el I I A #6 THWN-2 GECTO EXISTING GROUND ROD B 1" EMT W/2-#6 THWN-2,1410 THWN-2, 1410 THWN-2 GROUND C I" EMT W/2-#6 THWN-2,148 THWN-2 GROUND D I" EMT W/6-#10 THWN-2,148 THWN-2 GROUND F I" EMT W/2-#6 THWN-2,1410 THWN-2,1410 THWN-2 GROUND F #12 PV WIRE W/ #8 BARE COPPER BOND TO MODULES AND RAILS G 1"FMCW/3-#6THWN-2,1-#8THWN-2 GROUND Engineer / License Holder,; Issued / Revisions M ISSUED TO TOWNSHIP FOR PERMR 11/4/2014 NO. DESCRIPTION I"DATE Project Title: LOPES, CARLOS TRINITY ACCT #: 2013-24542 Project Address: 2 WOODBURY LANE N. DARTMOUTH, MA 027477 Drawing Title: PROPOSED 13.26kW SOLAR SYSTEM Drawing Information DRAWING DATE: 11/4/2014 DRAWN BY: "MR REVISED BY: :1 System Information: TOTAL SYSTEM SIZE: 13.26kW TOTAL MODULE COUNT: 52 MODULES USED: CANADIAN SOLART-255 MODULESPEC#: C56P-255P UTILITY COMPANY: NSTAR UTILITY ACCT#: UTILITY METER #: 1551311 DEALTYPE: Rev. No. Sheet P 1 PV 3/ SOLAR 2211 Allenwood Road 877-797722978 Wall, .Newjersey07719 www3riniry-SO14.1-Un ABBREVIATIONS ELECTRICAL NOTES JURISDICTION NOTE A AMPERE 1. WHERE ALL TERMINALS OF THE DISCONNECTING AC ALTERNATING CURRENT MEANS MAY BE ENERGIZED IN THE OPEN POSITION, BLDG BUILDING A SIGN WILL BE PROVIDED WARNING OF THE CONC CONCRETE HAZARDS PER ART. 690.17. DC DIRECT CURRENT 2. EACH UNGROUNDED CONDUCTOR OF THE EGC EQUIPMENT GROUNDING CONDUCTOR MULTIWIRE BRANCH CIRCUIT WILL BE IDENTIFIED BY (E) EXISTING PHASE AND SYSTEM PER ART. 210.5. EMT ELECTRICAL METALLIC TUBING 3. A NATIONALLY —RECOGNIZED TESTING GA.LV GALVANIZED LABORATORY SHALL LIST ALL EQUIPMENT IN GEC GROUNDING ELECTRODE CONDUCTOR COMPLIANCE WITH ART. 110.3. GND GROUND 4. CIRCUITS OVER 250V TO GROUND SHALL HDG HOT DIPPED GALVANIZED COMPLY WITH ART. 250.97, 250.92(B) CURRENT 5. DC CONDUCTORS EITHER DO NOT ENTER Imp CURRENT AT MAX POWER BUILDING OR ARE RUN IN METALLIC RACEWAYS OR Isc SHORT CIRCUIT CURRENT ENCLOSURES TO THE FIRST ACCESSIBLE DC kVA KILOVOLT AMPERE DISCONNECTING MEANS PER ART. 690.31(E). kW KILOWATT 6. ALL WIRES SHALL BE PROVIDED WITH STRAIN LBW LOAD BEARING WALL RELIEF AT ALL ENTRY INTO BOXES AS REQUIRED BY MIN MINIMUM UL LISTING. (N) NEW 7. MODULE FRAMES SHALL BE GROUNDED AT THE N"EUT NEUTRAL UL—LISTED LOCATION PROVIDED BY THE N TS NOT TO SCALE MANUFACTURER USING UL LISTED GROUNDING Or. ON CENTER HARDWARE. Pt. PROPERTY LINE 8. MODULE FRAMES, RAIL, AND POSTS SHALL BE POI POINT OF INTERCONNECTION BONDED WITH EQUIPMENT GROUND CONDUCTORS AND PV PHOTOVOLTAIC GROUNDED AT THE MAIN ELECTRIC PANEL. SCH SCHEDULE 9. THE DC GROUNDING ELECTRODE CONDUCTOR S5 STAINLESS STEEL SHALL BE SIZED ACCORDING TO ART. 250.166(B) & STC STANDARD TESTING CONDITIONS 690.47. TYP TYPICAL UPS UNINTERRUPTIBLE POWER SUPPLY V VOLT Venp VOLTAGE AT MAX POWER INDEX Vac VOLTAGE AT OPEN CIRCUIT VICINITY MAP IN W WATT � PV1 COVER SHEET 3R NEMA ARAINTIGHT f im PV2 SITE PLAN }fie a a PV3 STRUCTURAL VIEWS .. .. PV4 STRUCTURAL VIEWS `m.::. PV5 UPLIFT CALCULATIONS LICENSE GENERAL NOTES �� s� PV6 THREE LINE DIAGRAM y�'a �j�� .r Cutsheets Attached 168572 GEN 1. THIS SYSTEM IS GRID—INTERTIED VIA A # UL—LISTED POWER —CONDITIONING INVERTER. ELEC 1136 MR ., . • 2. THIS SYSTEM HAS NO BATTERIES, NO UPS:' . 3. SOLAR MOUNTING FRAMES ARE TO BE 41 GROUNDED. 4. ALL WORK TO BE DONE TO THE 8TH EDITION LE GROUNDING METHOD: SLEEKMOUNT OF THE MA STA:' MODU TE BUILDING CODE4 REV BY DATE COMMENTS 5. ALL ELECTRICAL WORK SHALL COMPLY WITH k����:,1 ; TU x. .°.; = : REVA COMMENTS AHJ. Dartmouth THE 2011 NATIONAL ELECTRIC CODE INCLUDING � � � � � �� ^; NAME 11/15/201 s..r MASSACHUSETTS AMENDMENTS. Combrid e Electric Li ht 'UTILITY• NSTAR Electric ( g 9 ) CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE JOB NUMBER JB-027430 00 PREMISE OWNER: LOPA�ES CCARL/OS ' DESCRIP11ON: LOOPES .a RESIDENCE DESIGN: Andrew North 1 v IJ SVhIIJ �' BENEFIT OF ANYONE EXCEPT SOLARCITY INC.. MOUNTING SYSTEM: 2 ` YYOODBUR I LN 11.025 .025 KW PV Array r,N a NOR SHALL IT BE DISCLOSED IN WHOLE OR IN (PART TO OTHERS OUTSIDE THE RECIPIENT'S Comp Mount Type C DARTMOUTH MA 02747 24 St Martin Drive Bunt 2, Unit i1 (ORGANIZATION, EXCEPT IN CONNECTION WITH ' `THE SALE AND USE OF THE RESPECTIVE MODULES: (45) YINGLI # YL245P-29b ' PAGE NAME: SHEET-. REV: DATE: 01 Marlborough, :: (010) T: (650) 638-1028 F:: ((650) 638-1029 - SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN INVERTER: 9782650952 COVER SHEET PV 1 11 /15/2013 (888)-SOL-CITY (765-2489)) w .sdarcity.corn 'PERMISSION of SOLARCITY INC. Multiale Inverters - PITCH: 33 ARRAY PITCH 33 MPl AZIMUTH:210 ARRAY AZIMUTH::210 MATERIAL: Comp Shingle STORY:: ;2 Stories PITCH: 33 ARRAY PITCH::33 MP2 AZIMUTH: 210 ARRAY AZIMUTH; ,210 MATERIAL: Comp Shingle STORY::,2 Stories PITCH: 33 ARRAY PITCH::�3 M MP3 AZIMUTH:120 ARRAY AZIMUTH:.1120 p v I MATERIAL: Comp Shingle STORY:, .'2 Stories Front Of House ---------- AC LEGEND D _ _ _ _ _ _ (E) UTILITY METER & WARNING LABEL r- _ - T - _ - Inv INVERTER W/ INTEGRATED DC DISECO Inv' �' Inv' �� 11 & WARNING LABELS 2 Woodbury Ln i `LJ a © DC DISCONNECT & WARNING LABELS - C © AC DISCONNECT & WARNING LABELS a o JUNCTION BOX ---"--'--- O Pl O DC COMBINER BOX & WARNING AC ED A O v .. - i 10 DISTRIBUTION PANEL & WARNING a � M P 2 ZT/8 u,a� LG LOAD CENTER & WARNING LABELS B O DEDICATED PV SYSTEM METER CONDUIT RUN ON EXTERIOR --- CONDUIT RUN ON INTERIOR — GATE/FENCE - - - INTERIOR EQUIPMENT SITE PLAN Scale: 3/32" = 1' 01, 10, 21' lvl�k id mr1m CONFIDENTIAL — THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR JOB NUMBER: JB-027430 00 PREMISE OVMER: DESCRIPTION: DESIGN: THE BONE; IT OF ANYONE EXCEPTS INC., MOUNTING SYSTEM: LOPES, LOPES RESIDENCE Andrew North\�'r VIIHOTY SHALL IT BE DISCLOSED IN WHOLE OR IN Comp Mount Type C pCARLOS 2 YYOODDUR I LN � �'025 KW PU Array �!�\S�larCitv- sNOR PART TO OTHERS OUTSIDE THE RECIPIENT'S ORGANIZATION, EXCEPT IN CONNECTION WITH MODULES T T r� ,1-7 DAR I MOU I H, MA 027`t THE SALE AND USE OF THE RESPECTIVE (45) YINGLI # YL245P-29b 24 St. Martin Dr1ve, Building 22, Unit 11 SOLARCITY EQUIPMENT, WTHOUT THE WRITTEN PERMISSION OF SOLARg1Y INC. INVERTER. MU tR:le Inverters Q 1 �1 9782650952 PAGE NAME SITE PLAN SHEET: REV: PV 2 DATE 11/15/2013 Marlborough, MA 017552 (888)—SOL>CITY (765-2489)65wmsolacityconn (E) 2x4 4„ -9 —11" 1'- (E) LBW SIDE VIEW OF MP1 RAFTER: (E) 2x4 ® 24 O.C. /q NTS CEILING JOIST: (E) 2x4 @ 24" O.C. MAX SPAN: 6'-11" MAX LANDSCAPE STANDOFF X—SPACING: 72" O.C. (STAGGERED) MAX PORTRAIT STANDOFF X-SPACING: 48" O.C. (STAGGERED) (E) 2x4 SIDE VIEW O F M P2 RAFTER: (E) 2x4 @ 24" O.C. 6 NTS CEILING JOIST: (E) 2x4 @ 24" O.C. MAX SPAN: 8'-1 MAX LANDSCAPE STANDOFF X-SPACING: 72" O.C. (STAGGERr--D) PV MODULE PV MODULE 5/16" BOLT WITH LOCK INSTALLATION ORDER 5/16" BOLT WITH LOCK INSTALLATION ORDER & FENDER WASHERS LOCATE RAFTER, MARK HOLE & FENDER WASHERS LOCATE RAFTER, MARK HOLE. ZEP LEVELING FOOT (1) LOCATION, AND DRILL PILOT ZEP LEVELING FOOT (1) LOCATION, AND DRILL PILOT ZEP ARRAY SKIRT (6) HOLE. ZEP ARRAY SKIRT (6) (2) HOLE. SEAL PILOT HOLE WITH SEAL PILOT HOLE WITH (4) (2) POLYURETHANE SEALANT. (4) POLYURETHANE SEALANT. ZEP COMP MOUNT C ZEP COMP MOUNT C _ _ _ ZEP FLASHING C _ _ _ (3) (.. ZEP FLASHING C (3(4) COMP. SHINGLE PLACE MOUNT (E) COMP. SHINGLE(E) (1)(E) 7SUBSEQUENT ROOF DECKING U (2) (E) ROOF DECKING (2) (5)INSTALL LAG BOLT WITH (5) 6 INSTALL LAG BOLT WITH 5/16 DIA LAG .BOLT {5) SEALING WASHER. /„(5) 5 16 DIA LAG BOLT�i'iTH SEALING WASHER. SEALING WASHER LOWEST MODULE SUBSEQUENT MODULES INSTALL LEVELING FOOT WITH (6) WITH SEALING WASHER _LOWEST MODULE MODULES G(6) INSTALL LEVELING FOOT WITH (2-1/2" EMBED, MIN) BOLT & WASHERS. (2-1/2" EMBED, MIN) BOLT &WASHERS. (E) RAFTER STANDOFF (E) RAFTER STANDOFF S1 Scale: 1 1/2" = 1' CONRDIDNTIAL— THE INFORMATION HERON CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC.,- NOR SH%J- IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE SOLARCi,7Y EQUIPMENT, WITHOUT THE WRITTEN PERMISS.1ON OF SOLARCITY INC. JOB NUMBER: JB-027430 00 PREMISE OWNER: DESCRIPTION: LOPES, CARLOS LOPES RESIDENCE 2 WOODBURY LN ` 11.025 KW PV Array DARTMOUTH, MA 02747 PAGE NAME 9782650952 STRUCTURAL VIEWS DESIGN: Andrew North a �;;; SoiarL1"�\J �1� �® MOUNTING SYSTEM: Comp Mount Type c MODULES: (45) YINGLI # YL245P-29b 24 St. Martin Drive, Building 2, [Unit 11 Marlborough, MA 01752 T: (650) 638-1028 F: (650) 6 g—tots (888)—SOL—CITY (765-2489) wwm%olarcityconn SHEEL REV DATE PV 3 11 15 2013 / / INVERTER: Multiple Inverters' (E) 20 (E) 20 S3 J 4"' 3'-5" 3'-6" '-4" 1 7" 77 1'- (E) LBW 1._211 S1DE V1EVV OF i"IP3 RAFTER: (E) 2x4 @ 24" O.C. NTS CEILING JOIST: (E) 2x4 @ 24" O.C. MAX SPAN: 3'-6" MAX LANDSCAPE STANDOFF X-SPACING: 72" O.C. (STAGGERED) PV MODULE 5/16" BOLT WITH LOCK INSTALLATION ORDER & FENDER WASHERS ZEPLEVELING FOOT LOCATE RAFTER, MARK HOLE (1) LOCATION, AND DRILL PILOT ZEiP ARRAY SKIRT (6) HOLE. (4) (2) SEAL PILOT HOLE WITH ZEP COMP MOUNT C POLYURETHANE SEALANT ZrEP FLASHING C - - - - (3) - - - - - - (3) INSERT FLASHING. (E) COMP. SHINGLE (1) , (4) PLACE MOUNT. (E) ROOF DECKING (2) 5/16" DIA LAG BOLT (5) (5) INSTALL LAG BOLT WITH WITH STEALING WASHER LOWEST MODULE SUBSEQUENT MODULES SEALING WASHER. (2-1/2" EMBED, MIN) (6) INSTALL LEVELING FOOT WITH BOLT & WASHERS. (E) RAFTER S3 STANDOFF CONFIDENTIAL CONTAINED — THE INFORMATION HEREIN SHALL NOT BE USED FOR THE PREMISE OWNER: DESCRIPTION: JOB NUMBER. J B-0 2 7 4 3 0 00 BENEFIT NOR PART OF ANYONE EXCEPT SOLARCITY INC., SHALL IT BE DISCLOSED IN WHOLE OR IN S OUTSIDE THE RECIPIENTS MOUNTING SYSTEM: COFI1 MOUIIt T p YPe LOPES, CARLOS 2 WOODBURY LN11.025 LOPES RESIDENCE DESIGN: Andrew North ■ IZ TION, SALE AND US EOF T CONNECTION 1MTH THE RESPECTIVE MODULES (45) YINGLI # YL245P-29b DARTMOUTH, MA 02747 KW PV Array� rC�� ` mORGANIZATION yTHE SOLARCITY PPE T, EQU9PMENT, WITHOUT THE WRITTENPERMISSION OF 50LARCITY INC. INtiERTER FS)—SOL—aTY Ie IFIVeftefS QPAGE 9782650952SHEET: NAME: REV: DATE:arlborough, artin Drive, Building 2, Unit 11MUltl MA 01752STRUCTURAL VIEWS PV 4 11 15 201638-1028 F (650) 636-1029;/ (765-2489) www.solarcity.c§orn UPLIFT CALCULATIONS 11.15.2013 e � #' slee (�u� TM ' Version #17.0 Str'u Ural Destan Software Project Information Risk Category: II PV System Type So�riiy Comp Roof, ...._ . .. Comp Roof ,. ;, P � , Number of Layers_ 2, Roof Slope 330 Rafter S' acin Z O.C. PV System Module Orientation Landscape :PV Module Area ,i �791f PV Module Width 39" a ... PV M �. ,.., Standoff Attachment Hardware Comp Mount Type C Calculation Uf Roof Snow Loads „ Ground Snow Load pg 30.0 psf ASCE Table 7 1 Surrounding;RooFSnow�65a(o :" '. Y_ ,. 19:5 psf ASCE Eq 7.4-1 Roof Snow Over PV Modules 40% 12.0 Esf 1 ASCE E :7.4-1 Wind Design Criteria Wind Design Code mlt�esign Metif6w) �'�` g :.. ASCE 7 05 Partially/FuCIy F�Yciosed� l thod �" Basic Wind Speed V ��. 110 mph Fg 6 1 = .. ._ Exposure Category, M. �. ;Section 6.5.b:3 Roof Style Gable Roof Fig 6-11B/Cjo-14tVB Mean Ro i h _ S' .. 9ecii©n 6 2 : : ,)f%hk '� . �, Effective Wind Area 1 Module , .,. A ,. .. 17.6 sf IBC 1509.7.1 Wind Pressure Calculation Coeff lei ints� Wind Pressure Exposure e Topographic Factor Kz 0.95 Table 6-3 Sectior165� Wind Directionality Factor �d . Kd a 0.85 "_...._ ��...,. u Table 5 4 Table'&-1' Im oriance . qh = 0.00256 (Kz) (Kzt) (Kd) (V'�2) (I) Equation 6-15 Velocity Pressure qh 24.9 sF Ext. Pressure Coefficient (Up) Ext Pressure toefficiit C)owri GCP (Up)„ ,, `:. G pawn -0.95 ., t Fig 6 11B/C -14A/B Design Wind Pressure p= h GC E uation 6-22 Wind doh) _, .8 . ,23.7 Issfi °' Wind Pressure Down wna 21.8 psF Allowable Standoff S acins . , . , X-Direction Y-Direction .; Max Allowable Standoff Spacing- Landscape 72' 39 anti ever Max Allbiarable Ca Landscape . �<1 2 # N k� Standoff Conti ation Landscape Staggered Max Standoff ' x �xib,�., '� ' .. .r _. _ 79�f.�. PV Assembly Dead Load NeiNind UpCrtt atiand�iff. W PV acEual ,M., 3 psf �.� 4)2 lbs. Uplift Capacity ofStandoffTallow 637 ibs H � m Standoflfle�rian 'Ca aci a lSCR,. FIDENTIAL — THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE JOB NUMBER: J B-027430 00 PREMISE OWNER: LOPES, CARLOS DESCRIPTION: LOPES RESIDENCE DESIGN: Andrew North =�`�r , �,,, S®��r'. �� v BU�lrm OF ANYONE EXCEPT SOLARCITY INC„ OR IN MOUNTING SYSTEM: - - 2 YYOODBUR L LN 11.025 KW PV Array q' NOR SHALL IT BE DISCLOSED IN WHOLE Comp Mount Type C PART TO OTHERS OUTSIDE THE RECIPIENrS MODULES DARTMOUTH, MA 02747 24 St. Martin Drive, Buil&rng 2, Unit 11 ORGANIZATION, EXCEPT IN CONNECTION WITH Td lE SALE AND USE OF THE RESPECTIVE (45) YINGLI # YL245P-29b PAGE NAME rT-HEEREV DATE:T: Marlborough, MA O01752 (650) 638-1028 F: (6`50) 638-1029 SCLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION of SOLARCI Y INC. INVERTER: 9782650952 UPLIFT CALCULATIONS PV 5 11/15/2013 (88B)—SOL—CITY (765-2489) rwww.soiarcityown Multi le Inverters GROUND SPECS MAIN PANEL SPECS GENERAL NOTES INVERTER SPECS MODULE SPECS L CENSE BOND (N) #8 GEC TO TWO (N) GROUND Panel Number Square-D Inv 1: DC Ungrounded INV GEN, ; 168572 Lpg p - (45) YINGLI # YL245P-29b # RODS AT PANEL WITH IRREVERSIBLE CRIMP Meter Number:1551311 Inv 2: DC Ungrounded Inverter, 60AW, 24OV, 97.5� w/%; SE1000-ZB02-SLV-NA PV Module; 245W, 221.6W PTC, H4, 46mm, Black Frame, YGE-Z 60, ZEP Enabled ELEC 1136 MR Tie -In: Supply Side Connection INV 2-(1)SOLAREDGE I. SE380OA-US LAB B Inverter; 38AW, 24OV, 97.5�a w SE1000-ZB02-SLV-NA Voc: 37.8 Vpmax: 30.2 INV 3 Isc AND Imp ARE SHOWN IN THE DC STRINGS IDENTIFIER fE 200A MAIN SERVICE PANEL E; 200/2P MAIN CIRCUIT BREAKER CUTLER -HAMMER SOLARGUARD Inverter 1 SolarCity (E) WIRING BRYANT Disconnect CUTLER -HAMMER METER Load Center 5 A > Io Disconnect 9 7 SOLAREDGE Dc+ - 1 String(s) car 9 on MP z SE6000A-US Dc- B 60A C D I E 35A/2P A L1 20OA/2P B Lz 13) N (E) LOADS GND - - - GND - - - GND - - - - - -I a r GEO �• I � I F277, GFP/GFCI o -- -- - EGC------------- - - - - - - - -- � --------------- I ------- f� DC+ DG I 4 2 DC+ DC DC- I I jDC+ 1 String(s) O£f 18 On MP 1 SolorCity 6 A Dc+ 3 Dc+ IM - - - DG DG String-(s)0.1f18OnMP3 EGC---- - - - - - - - - - -�--- ----- -- EGC ---i 1 Voc* MAX VOC AT MIN TEMP POI (2)Ground Rod; 5/8' x 8', Copper B (1)CUTLER-HAMMER # DG222NRB /� D SolarGuard Monitoring System A (2)SolarCity 4 STRING JUNCTION BOX D� -(2)ILSCO ¢ 'PC 4/0-#6 Disconnect; 60A, 24OVac, Fusible, NEMA 3R A 2x2 STRAGS, UNFUSED, GROUNDED Insulation Piercing Connector, Main 4/0-4, Tap 6-14 - (1) CUTLER-t1AMMER. # DG10ON8 - (4) ZEP P 850-1196-001 E (1)BRYANT / BR816L125RP Ground/Neutral it; 60-100A, General Duty (DG) Can iner Box Bracket; For ZEP, bottom mount only - (1)CUTLER-HAMMER DS16FK Load Center, 125A, 120/24OV, NEMA 3R Class R Fuse Kit PV (45)SOLAREDGE OP250-LV-AH4SM-2NA-Z -(1)CUILER-HAMM�R BR235 (2)FERRAZ SHAWMUTT TR60R PV BACKFEED OCP PowerBox 50W, H4, DC to DC, ZEP, ETL Listed Breaker, 35A 2P, 2 Spaces Fuse; 60A, 250V, glass RK5 - (i)CUTLER-HAMMER # BR220 Breaker, 20A 2P, 2 Spaces C (I CUTLER -HAMMER # DG222URB s SUPPLY SIDE CONNECTION. DISCONNECTING MEANS SHALL BE SUITABLE O Disconnect; 60A,#24OVac, Non -Fusible, NEMA 3R 1 CUTLER-/NNAMMER K' DG10ONB AS SERVICE EQUIPMENT AND SHALL BE RATED PER NEC. Ground eutral it; 60-100A, General Duty (DG) (1)AWG #6, THWN-2, Black (1)AWG #8, THWN-2, Black 1 AWG #10, THWN-2, Black Voc* = 500 VDC Isc = 15 ADC 2) AWG #10, PV WIRE, Black Voc* = 500 VDSC Isc = 15 ADC O (1)AWG #6, THWN-2, Red O o (1)AWG #8, THWN-2, Red - 4 Q (1)AWG #10, THAN-2, Red Vmp = 350 VDC Imp= 12.44 ADC 1 R (1)AWG #10, Solid Bare Copper EGC Vmp = 350 VDT"C Imp= 6.22 ADC - - O� _ O� (1)AWG , THWN-2, White NEUTRAL Vmp =240 VAC Imp=41 AAC 1 AWG 10 THWN-2 White NEUTRAL Vm =240 VAC Im - AAC 1 AWG 10 THWN 2 Green EGC i AWG THWN-2, Green EGC GEC - 1 Conduit Kit _ 3 4..EMT - 1 AWG . _ ._ .. ( ) _ .. f8 _ ..... , . e , . , ../ . , , . ( . ) . 9 , ... / ' . . ..... ... ... ( ) #8,. RWN-2,. Green .. EGC/GEC,-(1)Condwt. Kit;. 3/4".EMT, .. _ ...:.. (1)AWG #10, THWN-2, Black Voc* 500 VDC isc = 15 ADC (2 AWG .#10,.. PV WIRE, Black - Voc* 500 VDSC Isc =15 ADC (1)AWG #6, THWN-2, Black (1)AWG #10, THWN-2, Black O (1)AWG #10, THWN-2, Red Vmp = 350 VDC Imp= 6.22 ADC O (1)AWG #10, Solid Bare Copper EGC Vmp = 350 VDjC _ Imp= 12.44 ADC M (1) AWG #6, THWN-2, Red 8 (1)AWG #10, THWN-2, Red (1) AWG #10, THWN-2, .Green, ,EGC RF i AWG .. .. .... - ®�( ) #6, THWN-2 White NEUTRAL Vmp =240 VAC Imp AAC O �(1)AWG #10, THWN-2, White NEUTRAL Vmp =240 VAC Imp AAC (1)AWG �10, THWN-2, Black Voc* = 500 VDC Isc = 15 ADC (2)AWG #10, P. WIRE, Black Voc* 500 VDC .Isc =.15 .. ADC. .(1)AWG #§,_Solid Bare. Copper, GEC, 0 Xondgit. Kit;.3/4',EMT. , , , , , . ; , , , (1)AWG #8,:1H,WN-2,. Green EGC/GEC.-(1)Conduit, Kit ;.3/4".EMT........ .. © (1)AWG #10, THWN-2, Red Vmp = 350 VDC Imp= 12.44 ADC O (1)AWG #10, Solid Bare Copper EGC Vmp = 350 VDIC Imp= 12.44 ADC 0)AWG #10, THWN72,.Green.. EGC .... -(1)Conduit.Kit;.3/4'.EMT.......... CONFIDENTIAL - THE INFORMATION HEREIN JOB NUMBER: PREMISE OWNER: DESCRIPTION: DESIGN: JB-�27430 �� CONTAINED SHALL NOT USED FOR THE LOPES, CARLOS LOPES RESIDENCE Andrew North ,4Q ■ r,_ _ BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM: WH� �,� Y NOR SHALL IT BE DISCLOSED IN MOLE OR IN Comp Mount Type C 2 WOODBUR I�/ LN 11.025 KW P V Array `�®II/ ��' PART TO OTHERS OUTSIDE THE RECIPIENTS D A D TM O U TH M A 027 A 7 EGC---1-'......... ------ -- EGC J ; I ♦ (1)Conduit Kit; 1" EMT N Inverter 2 I Zx SOLAREDGE i SE380OA-US I i 20A/2P - - _ -r EC_y i L1 T L2 TO 120/240V i i N SINGLE PHASE I I L - - - - - - EGci UTILITY SERVICE I I GEC 21-V GFP/GFCI GND ORGANIZATION, EXCEPT IN CONNECTION WITH MODULES: THE SALE AND USE OF THE RESPECTIVE (45) YINGLI # YL245P-29b Marlbrough24 St, Martin Drive, 8uilding 2, Unit 11 01752 SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN INVERTER: PAGE NAME SHEET: REV: DATE T.(650) 638-1028 F A(650) 638-1029 PERMISSION OF SOLARCITY INC. Multiple Inverters 9782650952 THREE LINE DIAGRAM PV 6 11/15/2013 (888)-SOL-CITY (765-'�2489) www.solarcity.com Olar. ff 'za ,. �,a _ All our inverters are part of SolarEd e's innovative system g y tam — over 97% efficiency and best -in -class reliability. Our fixed - designed to provide superior s at a competitive price. The SolarEdge inverter performance combines voltage technology ensures the inverter is always working at its a sophisticated, ; optimal input voltage, regardless of the number of modules or digital control technology and a one stage, ultra -efficient power environmental conditions. conversion architecture to achieve superior performance TECHNICAL DATA ram. jW AWN * _ ;'«may..,: _,:-'3 .�.f...<•` - ",- . ,,.,., .:<a s may' <y t v i a, it, 11111W'1111'�' �M y r ..: f The only inverters specially designed for distributed DC architecture * Superior efficiency (97.5%) * Small, lightweight and easy to install on provided bracket 012�25 ® Built-in module -level monitoring ® Communication to internet via Ethernet or Wireless ■ Outdoor and indoor installation le Integral AC/DC Switch SE3000A US MEW!A-US SE3800I! SE5000A-US SE6000A-US SE7000A-US Rated AC Power Out ut P 3000 3800. 5000 wassa 5200@208V 6000-240V 5200@208V 6000@240V W " 6000@277V 7000@277V Max. AC Power output P 3000 3800 5000 5200@208V - 6000@240V 5200@208V 6000@240V W „ - 6000@277V 7000@277V AC Output Voltage Min.-Nom.-Max. 183 - 208 - 229 / 211- 240 - 264 183 - 208 - 229 / 211- 240-264 / 244- 277 294 - AC Frequency Min: Nom: Max. - - 59.3 - 60 - 60.5 Vac Max. Continuous Output Current 0208V 14.5 18.5 24 25 Hz 25 Max. Continuous Output Current @240V 12.5 16 21 A 25 25 Max. Continuous Output Current CD277V - 18.5 A 22 25 GFDI A 1 Utility Monitoring, Islanding Protection, Country Configurable Thresholds Yes _ A Recommended Max. DC Power * (STC) 3750 4750 6250. 7500 8750 W Transformer -less, Ungrounded - Yes Max. Input Voltage - 500 Nom. DC Input Voltage 325 @ 208V / 350 @ 240V / 400 @ 277V Vdc Vdc Max. Input Current 10 112.5 1 16 18 18.5 Adc Reverse -Polarity Protection - Yes Ground -Fault Isolation Detection - 600kQ Sensitivity Maximum Inverter Efficiency 97.8 1 97.7 98.3 98.3 98.3 % CEC Weighted Efficiency 97 5 97 @ 208V / 97.5@ 208V, 240V 97 @ 208V / 97.5@ 240V / 97.5@ 240V / 98 @ 277V 98 @ 277V' Nighttime Power Consumption < 2.5 W Supported Communication Interfaces RS485, RS232, Ethernet, Zigbee (optional) Safety UL1741, IEC-62103 (EN50178), IEC-62109 ~ Grid Connection Standards Utility -Interactive, VDE 0126-1-1, AS-4777, RD-1663 , DK 5940, IEEE1547 Emissions FCC part15 class B, IEC61000-6-2, IEC61000-6-3, IEC61000.3-11, IEC61000-3-12 RoHS Yes AC Output ` - 3/4" Conduit DC Input 3/4" Conduit Dimensions (HxWxD) 21 x 12.5 x 7 / 540x315x172 _ 21x12.5x7.5/540x315x191 in/mm Dimensions with AC/DC.Switch (HxWxD) 30.5 x 12.5 x 7 / 775x315x172 30.5 x 12.5 x 7.5 / 775 x 315 x 191 in/mm Weight 42, 45 / 20.5 Weight with AC/DC Switch 48.5 / 22 52 / 23.5 Cooling Natural Convection lb / kg Min. -Max. Operating Temperature Range -4 / -20 (CAN version -40 / -40) to +140 / +60 °F / °C Protection Rating - NEMA 3R 'Hgh.,na. DC power may be (ned, anayrereey Ac ced— e The follow ng Par( Numbers are ava fable (CAN PNs are eligible for me Wed, FIT and micam): $y 208/24OV,mn OW'tng hamP-4F/-20C: SE303OXU1, SE380OA-US, SE5000AU1, SE6000AL5, SE7000A-US 277V, m n operating temp 4F/ 20C: SE5000AU5, SE6000A-US, SE7000AUS 208/24OV, m n. operating temp 4OF/-40C: SE3000A.U11AN, SE3800AUSL N, SE50MA USCAN, SE6000AU"AN 277V, min opem img temp 4OF/AOC: 5E5000A-USCAN, 5E60GOAUSLAN, SE7000XUS-CAN USA 0 Germany a Italy a France 0 Japan IS China 0 Israel solar- ®®_ architects of energy www.solaredge.com *roWUCts Orenergy ® SolarEdge Tech g I 20032012 All Ighte reserved. SOLAREDGE, me SolarEdge logo, ARCHITECTS OF ENERGY and OPTIMIZED BY SOLAREDGE are tmdemarke or registered tmdemarks a SolarEdge Technologies, Inc. All omer tmdeme,,s mentioned harem are trademarks of mmr respectve owners. Date' 06/2012. V.03.1311cjeIX m change without not ce. i ' Ali Solar' it i A superior approach to maximizing the throughput of photovoltaic systems using module embedded electronics Y g I Up to 25% increase in power output m Superior efficiency (99.5%) - peak performance in both mismatched and unshaded conditions In Flexible system design for maximum space utilization i in Next generation maintenance with module level monitoring and smart alerts a Unprecedented installer and firefighter safety in The most cost effective solution for residential, commercial and large field installations j architects of energy- i HIGHLIGHTS • Module level MPPT- optimizes each module independently Ile Lower installation costs with faster design, less wiring, DC ee Dynamically tracks the global maximum operating point for both disconnects and fuses modules and PV inverter ml Easy and flexible installation — use the same installation methods Is Module -level monitoring for automatic module and string level as exist today fault detection allowing easy maintenance Ile Allows parallel uneven length strings and multi -faceted n Electric arc detection - reduces fire hazards installations In Unprecedented installerand firefighter safety mode - safe module Im Allows connection of different module types simplifying inventory voltage when inverter is disconnected or off considerations ® Connection of one or more modules to each power optimizer a Immediate installation feedback for quick commissioning TECHNICAL DATA OP250-LV OP300-MV/OP400-MV OP400-EV (Q4 2011) 'i• '.- • �r _�. �.� .- . ram"' 1^ ,� .;.: � ;.: _ � � �1 �.__.:. _.��ar :-:. 400 W Rated Input DC power 250 300 / 400 Absolute Maximum Input Voltage (Voc) 55 75 125 Vdc MPPT Operating Range 5 - 55 5 - 75 60 - 125 Vdc Maximum Input Current 10 10 5.5 Adc Reverse -Polarity Protection Yes Maximum Efficiency 99.5 % European Weighted Efficiency 98.8 % CEC Weighted Efficiency 98.7 % Inductive Lightning Protection 1 m / ft Overvoltage Category II Maximum Output Current 15 Adc Operating Output Voltage 5 - 60 Vdc Total Maximum String Voltage (Controlled by 500 Vdc Inverter) - US and EU 1-ph Total Maximum String Voltage (Controlled by 950 Vdc Inverter) - EU 3-ph Safety Output Voltage per Power Optimizer 1 Vdc Minimum Number of Power Optimizers per 8 (1-ph system) / 16 (3-ph system) String (1 or More Modules per power optimizer) Maximum Number of Power Optimizers per Module power dependent; typically 20 - 25 (1-ph system) / String (1 or More Modules per power optimizer) 45 - 50 (3-ph system) Parallel Strings of Different Lengths or Orientations Yes EMC FCC Part15 Class B, IEC61000-6-2, IEC61000-6-3 Safety IEC-62103 (class II safety), UL1741 Material UL-94 (5-VA), UV Resistant RoHS Yes Dimensions (WxLxH) 120x13Ox37 / 4.72x5.11x1.45 mm / in Weight 450 / 1.0 gr/ lb Output PV Wire 0.95 m / 3 ft length ; 6 Fr ; MC4 Input Connector MC4 / Tyco / H+S / Amphenol — H4 Operating Temperature Range -40 -+65 / -40 -+150 C / OF Protection Rating IP65 / NEMA 4 Relative Humidity 0 - 100 % USA 900 Golden Gate Terrace, Suite E, Grass Valley CA 95945, USA c ��� / $f)laf` d Germany Bretonischer Ring 18, 85630 Grasbrunn (Munich), Germany F\ Japan B-9 Ariake Frontier Building, 3-7-26 Ariake, Koto-Ku, Tokyo 135-0063, Japan architects of energy - Israel 6 HeHarash St. PO.Box 7349, Neve Neeman, Hod Hasharon 45240, Israel www.solaredge.com © SolarEdge Technologies, Inc. 2009-2011 . All rights reserved. SOIAREDGE, the SolarEdge logo, ARCHITECTS OF ENERGY and OPTIMIZED BY SOIAREDGE are trademarks or registered trademarks of SolarEdge Technologies Inc. All other trademarks mentioned herein are trademarks of their respective owners. Date: 09/2011. Subject to change without notice. i I 8 T> ®. x.. ®t i 1 nt u r t , 1 n Sol rCi Sleek oust Com tY The SolarCity SleekMount hardware solution • Utilizes Zep Solar hardware and UL 1703 listed Installation Instructions is optimized to achieve superior strength and Zep CompatibleTM modules ] r, Drill Pilot Hole of Proper Diameter for aesthetics while minimizing roof disruption and labor. The elimination of visible rail ends and • Interlock and grounding devices in system UL' ' Fastener Size Per NDS Section 1.1.3.2 mounting clamps, combined with the addition listed to UL 2703 Seal pilot hole with roofing sealant of array trim and a lower profile a II contribute Y • Interlock and Ground Zep ETL listed to UL 1703 , as "Grounding and Bonding System" , Insert Comp Mount flashing under upper to a more visually appealing system. SleekMount utilizes ZepCompatible modules with p •Ground Zep UL and ETL listed to UL 467 as .,._ � layer of shingle g strengthened frames that attach directly to grounding device ' Place Comp Mount centered - Zep Solar standoffs, effectively eliminating the need for rail and reducing the number of • Painted galvanized waterproof flashing _.. upon flashing standoffs required. In addition, composition e Anodized components for corrosion resistance Install lag pursuant to NDS Section 11.1.3 shingles are not required to be cut for this with sealing washer. system, allowing for minimal roof disturbance. Applicable for vent spanning functions '"" - Secure Leveling Foot to the Comp Mount using machine Screw Place module Components 5/16 Machine Screwft �- Leveling Foot ,401 Lag Screw ' Comp Mount Y �' Comp Mount Flashing Ili 0 January 2013 "FA ON) ui. LISTED art o January 2013 e� roMPat e. YL250P-29b YL245P-29b 60 _E-Z j YI9�G l e CELL SERIES� YL240P-29b OLAR JSY YL235P-29b YL230P-29b U.S. Soccer Powered by Yingli Solar EMMWIdeal for residential and commercial applications where cost savings, Installation time, and aesthetics matter most. Ir Lower balance -of -system costs with Zep Compatible- frame. Reduce on -roof labor costs by more than 25%. Leverage the built-in grounding system - if it's mounted, it's grounded. Lower your parts count- eliminate rails, screws,` mounting clips, and grounding hardware., I Design and permit projects easily with access ' to layout calculator and stamped drawings. t. f Lower installation costs with savings across sr x } equipment and labor. It Minimize roof penetrations while maintaining the system's structural integrity. Invest in an attractive solar array that includes a black frame, low mounting profile, and aesthetic array skirt. j Increase energy output with flexible module layouts (portrait or landscape). Trust in the reliability and theft -resistance of the Zep Compatible- system. Leading limited power warranty* ensures �r. 91.2 % of rated power for 10 years, and 80.7 .Il of rated power for 25 years. r , AC SOLUTION OPTION The YGE-Z Series is now available as 10-year limited product warranty. ;enpflas1, an Enphase Energized'" AC Solution. "� ' This solution delivers optimum ----- - In compliance with our warrantyterms and conditions.. performance and integrated intelligence. f The Enphase M215-Z Zep Compatible Microinverter is designed to connect directly into the Z Series module e' groove, eliminating the need for tools or fasteners- all with one easy step. UL 1703 and ULC 1703, CEC, FSEC, ISO 9001:2008, - ISO 14001:2004, BS OHSAS 18001:2007, SA8000 c ul US �`5 l48 �7- LISTED L' �i CERT o Intelligent real-time IPHorovoumc uoou�l _' vEM ' monitoring at the system 4400 d and module level with --- --- - - --Y -- x z a Enlighten. YINGLISOLAR.COM/US Yingli Americas.,a x E - Z 6, C E L SERIES Powered by YINGLI ELECTRICAL PERFORMANCE t GENERAL CHARACTERISTICS Module type YL250P29b YL245P29b YL240P29b YL235P29b YL230P-296 _ ---230 Dirr-ions(L/W/H) _ 64.96 in(1650 mm)/ 38.98 in(990 min)/ Power output I P.- 1 W 250 jl.--� 245 1' 240 235 _ 1.81 in (46 mm) Power output tolerances APB... W I -0/+5 Weight 45.2 Ibs (20.5 kg) Module efficiency rim % 15.3 i 15.0 14.7 ;; 14.4 rJ--14.1 Voltage at P... V.Pp V 30.4 30.2 29.5 29.5 29.5 Current atP .. lac A 8.24 8.11 8.14 7.97 _ - 7.80 PACKAGING SPECIFICATIONS Open circu t voltage V., v 38.4 37.8 37.5 37.0 i ---- 37.0 Number of modules per pallet = 22 Short-circuit current 6 A _ 8.79 8.63 8.65 8.54 jj - _ 8.40 - Number of pallets per 53' container, 36 STC: 1000W/m2 m,di-ce, 25°C cell temperature, AM1.59 spectrum according to EN 60904-3. ------- -- '--------- Average relative of ci,rcy reduction of 5.0°h at 200W/m' according to EN 60904-1 Packaging box dimensions (L/W/H) , 67 in (1700 mm) / 45 in (1150 mm) / - 47 in(1190 mm) Box weight 1076 lbs (488 kg) Power output � P IL W I� 181 1 17 177 9 4 3 110 7 167.0 Voltage t P.fill V,.np V 27 6 1 _27 2 J: 26 6 � 26 6 26.6 Units: inch (min) Current at Pm.. 1 I V{ 1 A l 6.56 6.54 6.56 1 6.42 j 6.29 38.98 990 r u t voltage 354 II 34v -1 342 338 -'-"- ' --' j 3;8Op ----"' 36.85(936) 1.81 (46) Short-circuit current Iry 1:, 11 A 7.12 1 6.99 7.01 6.92 6.81 NOCT. open cult module operanon temperature at 800W/m2 rradian e, 20°C ambient temperature, 1 m/s w nd speed m THERMAL CHARACTERISTICS Nominal operating cell temperature INocr °C 46+/ 2 � Temperature coefficient of P y %/ C 0.45 Temperature coefficient of V !1 R_--0.33 Temperature coefficient of I. no.� %/°C II 0.06 J'I Temperature coefficient of V -0.45 OPERATING CONDITIONS Max. system voltage 600Voc Max. series fuse rating 15A Limiting reverse current {r 15A Operating temperature range Max.tatic load front (e.g., snow and wind) -40 to 194°F(-40 to 90°C) 50 psf (2400 Pa) Max. static load, back (e.g., wind) 50 psf (2400 Pa) Hailstone impact_ in (25 mm) at 51 mph (23 m/s) -_ CONSTRUCTION MATERIALS -1 - _- Front cover (material/type/thickness) Low iron glass /tempered / 3.2 mm Glass may have anti -reflective coating Cell (quantity/material/type/dimensions/ 60 / polys Icon / mult crystal) ne / area/# of busbars) 156 mm x 156 mm / 243.3 cm2 / 2 or 3 Encapsulant (material) Ethylene vinyl acetate (EVA) Frame (material/color) Anodized luminum alloy / black Junction box (protection degree) zIP65 Cable (type/length/gauge/outside diameter) PV Wire / 43.31 in (1100 mm) / 12 AWG / 0.244 in (6.2 min) Plug connector ry I Amphenol / H4 / IP68 (manufacturer/type/protection degree) 3.94 (100) L Warning: Read the Installation and User Manual in its entirety before handling, installing, and operating Yingli modules. Our Partners The specifications in this datasheet are not guaranteed and are subject to change without prior notice. This datasheet complies with EN 50380:2003 requirements. Yingli Green Energy Americas, Inc. info@yingliamericas.com Tel: +1 (888) 686-8820 YINGLISOLAR.COM/US I NYSE:YGE © Yingli Green Energy Holding Co. Ltd. I YGEZ60CeIISeries2012_EN_201206_V01 YID LAR t U.S. Soccer Powered by Yingli Solar