RESIDENTIAL FLOOR PLANGRANDI� S OMES
TABLE OF GENERAL NOTES
1. THE GENERAL CONTRACTOR SHALL
NOTIFY THE ARCHITECTS OF ALL
DISCREPANCIES BETWEEN
LT-1.1
Title Sheet'
CONSTRUCTION DOCUMENTS AND
A-1.1
Basement Plan
EXISTING CONDITIONS
A-1.2
First Floor Plan
2. THE GENERALCONTRACTOR SHALL
A-1.4
Roof Plan
COMPLY WITH ALL FEDERAL, STATE, AND
LOCAL REGULATIONS THAT MAYAPPLY
A-2.1
Elevations
TO THE CONSTRUCTION OF THE
PROJECT
S-1.1
Foundation Plan and
S ALL WORK OF THIS PROJECT SHALL
T led $eCPIC05
iP
COMPLY WRH ACCEPTED BUILDING
PRACTICES AND ALL DUKE HAVING
S-1.2
First Floor Framers Plan
JURISDICTION OVER THIS PROJECT
S-14
At FOor Framers Plan
5-1.5
ROOF Fpdmer's Plan
y, REFER TO LIMITS OF WORK DRAWINGS
FOR OVERALL DESCRIPTIONS of WORK
AREAS
5. THE GENERAL CONTRACTOR SHALL
LEAVE THE PROJECT SITE AND ALL
SURROUNDING AREAS IN FINAL CLEAR
CONDITION INCLUDING THE REMOVAL OF
ALL DEBRIS RESULTING FROM
CONSTRUCTION
B. THE CONTRACTOR SHALL ATALL TIMES
DURING THE PROGRESS OF THE WORK
REMOVE ALL CONSTRUCTION DEBRIS
AND MAINTAIN A DUST FREE
ENVIRONMENT FOR ALLAOJACENT
AREAS
Z. THE CONTRACTOR SHALL COORDINATE
THE WORK OF ALL TRADES AND VERIFY
THAT ALL C UTTING AND PATCH ING
REQUIRED FOR ME INSTALLATION OF
ALL MATERIALS BY ALL MATES 15
PRCPERLYE%ECIRED
8. ME CONTRACTOR SHALL UTILIZE THE
AREAS WITHIN THE SCOPE OF WORK
FOR STORAGE OF MATERIALS AND
—
TOCLs
Lot 7 _
4 Sabrina's Waya
Dartmouth, MA M
Permit Set o
5/10/2019
efiLr COPY CODE
Ir
9, ALL WRITTEN DIMENSIONS SHALL HAVE
- BUILD I N G PLANS ON SITE AT RFASONABL E TI M ES(5111.11)
PRECEDENT€THERS
THERE IS A CONFLICT IN DIMENSION S,
• BUILDING PERMIT ON SITE PROMINENTLY DISPLAYED (511 14)
NOTIFY THE ARCHITECT FOR
CLARIFICATION
• FOUNDATION GROUNDING'. WHERE FOOTINGEOUNDATIONSYSTEMONONE-TWO
FAMILY BUILDINGS CONTAIN STEEL REINFORCING, CONFORMANCE TO 627 CMR 12, 00
10, VERIFY FIELD CONDITIONS PRIOR TO
COMMENCEMENT OF EACH PORTION OF
(ELECTRICAL CODE) GROUNDING CRITERIA a REQUIRED 85011)
(
THE WORK THE CONTRACT DRAWING
•SITE GRADING/DRAINING: THE GRADE AWAY FROM FOUNDATION WALLS SHALL FALL
RRE COMPLIMENTARYAND WHAT IS
MINIMUM OF 6" WITHIN THE FIRST 10(5101. 3)
EQUIRED BY ONE SHALL BE BINDING As
IF REQUIRED WHAT. ME CONTRACTOR
• PIPES THROUGH FOOTING OR FOUNDATION WALLS; ANY PIPING PASSING THROUGH
SHALL COORDINATE ALL PORTIONS OF
THE WORK
FOOTING OR FOUNDATION WALL REQUIRES A SLEEVE TWO SIZES GREATER THAN THE
PIPE (7602.5)
11. DIMENSIONS ARE TO CENTER LINES.
EXISTING BUILDING GRID LINES, OR TO
. FOUNDATION DRAINING. CONCRETE OF MASONRY FOUNDATIONS; DUANE SHALL BE
FACE OF FINISHED SURFACE UNLESS
PROVIDED(5i013)(&Een
OTHERWISE NOTED
I. EGRESSDOORS: NO KEYED LOCKS PERMITTED ON INTERIOR OF EGRESS DOORS
12. ALL GYPSUM WALL BOARD
(5311A4)
CONFORMTO
ENSTRUCIONSHALL
RECOMMENDATIONS PRACTICES
'STAIRWAYS MAXIMUM RISE 81/6" MINIMUM RUN ETH5311. 53.1 OPEN RISERSARE
l )
STANDARDSANDINSTRUC➢ONS
PERMITTED PROVIDED THAT OPENING DOES NOT EXCEED 5"(53115.3.3)
COMPANY
PUBTHE
BY U S, GRUCTIC C
GYPSUM
THE GWSD
YPSUM CONSTPSUM RUCTION
.HEADERS 'APAPPRNTESIZE FOR FRMAINGTABLE 55025 MOST HEAOERS REQUIRE
l )
HANDBOOK
DOUBLE JACK STUDS
MALL FINISXEDWORK SHALL BE FREE
•DESIGN& CONSTRUCTION OF WOOD WALLS SHALL BE DESIGNED&CONSTRUCTED IN
OF DEFECTS. THE OWNER RESERVES
ACCORDANCE WITH780 OUR 56.0cAND 780 CRAB FIGURES (56023.1)&(56023)
THE RIGHT TOREJEC MATERIALS
TANDHE
WORK MANSHIP WHICH ARE NOT
" PROTECTION AGAINST DAMAGE: PIPES & WIRES SHALL BE PROTECTED By SHIELD
CONSIDERED TO BE AT THE HIGHEST
PLATES
STANDARDS OF THE VARIOUS TRADES
INVOLVED
• SAFETY GLAGNG INGRESS& EGRESS DOORS REQUIRED WITHIN 24 INCHES DOORS
OTHER NEW HAZARDOUS LOCATIONS: STAIRWAYS, RAMPS. LANDINGS(52084)
14, NO
ALLOWED UNLESQRSUBSTITUTIONSEBYARE
ALLOWED UNLESS APPROVED BY THE
VENTED DIRECT TDOUTSIDE
• BATHROOM VENQUIR
OWNER
DMINIM M22
•pTTICACCEB REQUIRED MINIMUM 22"%30"FOR 305Q FYANO HEIGHT OF 30"+(5BW.1)
EtGHT F3
15.ALLDATAOUTLETSMVSTBEONA
-SOLD BLOCKING REQUIRED IN WALLAT FLOOR LINE, POINTS OF CANTILEVERAND
DEDICATED, ISOLATED CIRCUIT
OVER BEARING BEAM AnCEP& 5502].T)
•VENTILATIONAREA: THE MINIMUM CPENABLEAREATC THE OUTDOORS SHALL BEA%
!. OF THE FLOOR AREA BEING VENTILATED 531
R
in
W
F
T-1.1
(mot t BA M NT PLAN
1/4 -11-01, The Orchardi Lot 7- 4 Sabrina's Way
L�=o
� a
jE
3
0
E
i
q
O '
z
Z
Z
wa
w0
0
mo
a e�
�® j
/ /E019I
E
` I
..
r
r
*161 mma u WmAl,
Cia Iv
tv
'-
C
FTATIO SLIDER
Ili
KIT6MEN
MASTTERBbRM
aFAMILY
16-0
�
U50ROOOM
B
_..:�'I .I-
'
•..
Con$ro�
r
rs1 1 x
BEDROOM ___
t3'o'x l::y
FOV
to lest/
n
LIVIN
6 ARG AREA
6T
3
n >�
14
—,ILL
LE
I'll ml
A-1.2
A-1.4
------------------------------------------------------------
ANCHOR BOLTS
MARTS FROM
CORNERS
STEP TO GONE AS NEEDED IN 2INCREMENTS
NOT LESS THAN n' APART. G C. TO COORD,
:7G u ► _
.aM--
�01WIN1110104
FR05T WALL 5E6TION
05ASEMFHTWl
s'^
S-1.1
mom no IFIT61C Cm\I I I \ Lei 111 Wmag
BEWS 6v OTHER
a
U
lM
w
S-1.4
BEP SBY OTHER
6EAMS ev OTHER