Loading...
ZONING REVIEW PLAN8" Car N �t N Ln °- d�� J"rY 67 ru Cd r \y ` sj his / C.O120, A) SANDY ni (H) SANDY LOAM (Cl) LOAMY cAHD MOTTLES (CR) LOAMY SAND 0' 120' (A) Ek H) 21., SANDY LOAM (CI) 40' SANDY LOAM NOE / 57' LOAMY SAN / LOAMY SAND 71' MOTTLES 1257 124.7 (C4) LOAMY SAND PERCOLATION RATES: V/ 9 min. PERCOLATION RAT-S! 1'/ 3 min, ` / ) LOCUSMAPSCALE: . \ GROUND WATER DEPTH: 74' mottles GROUND WATER ➢EPTHi 71' mottles ELL SE r3) N OYJt SOIL EVALUATOR: ALAN HEUREUX SOIL EVALUATOR, ALAN HEUREUX / r. / 6 ,aa f j DATE: 5-23--96 DATE: 5-23-96 lk A -a Pow 133 ro PERC, TEST PERFORMED BY: MAUK, BOUCHER AND HEUREUX, INC. LOf I-3B 8Xa)�� ,' INSPECTOR: SUSAN GRIFFIN w6wu 3sJo,, DESIGN DATA GENERAL NOTES: DESIGN PERC 10 M L1110 (CLAtAfIL 1. All work .must be in accordance with the Massachusetts Department of % S$- Environmental Protection Regulations 310 CMR 11 GO & 150D (Title k0 DESIGN FLOW 3 BR x 110 GPD/BR = 330 GPD and any local Board of Health Modifications. ° ,^x4 .. LEACH AREAI 24'>CZS' _ (POO SF 2. Nomodifications shall be d t .this system. without priorwritten I� ` pp al by the engineer and the local Board of F alm. 4 CALCULATIONS: (op0 BG 3. Engineer and the Bard of Health must inspect th completed system prior'to backfll'n9 N / / 4. Elevations M1 n onplan are based on an ass Ed datum. 5. Heary equipment shall not be run over the tl'spostl system 6. All unsuitable soil Is to be excavated from the Le h g Area as shown on plan and ba kf Iled with. clean gravel or coarse sand as J specified in 310 CMR 15255(2) 7. 8 Septctltank, dstrbutoned store s ball be hall ben fines and dust./ Sons Inc or a manufactured s specifications -- A approved t epgrovde and water tight seal (it all ants here e Grout shall be used to g j pipe fj° b _ enters or .leaves a concrete structure 0 �� / to 9. Outlet distribution Ines shall be level for O minimum of the first two feel t1�P\b j ` r G 0VpkgC7 N of their length as specified in 310 CMR 15.232(3). ZSi 5 ! vq LOT 1-36 - 10. ABoard ldb Health Efi cerf Compliance as requiredby 310 CMR 15.021 / 3 must be obtained y contractorupon completion e' work. 11 Distribution Ines to be capped at outlets SIDVIVISION LOf 118 j 12 Thisjste is not designed f c garbage grinder, mur so s ti`' PLAN LEGEND 6'5,9�1 5c(.Fk _ a• P.V,C, PIPE SCHL 40 (TIGHT JOINTS)) SEPTIC TANK S6!� � �56 EXISTING CONTOURS �yJS%✓A S6 PROPOSED CONTOURS E7 ➢ISTRIBUTION BOX 9{5 ® RESERVE LEACH AREA l�� TEST PIT siyo� as \'7u 'fbF`.'L —W WATER LINE It WATER TABLE TEST B A C K F— 2 L— L— OW WELL B.M. w+ BENCH MARK LOT iS I aoa000 oa 2-WASHED CRUSHED STDNE 1 i ,a peeve° o"o ik6o"o o"pasutn c usM�a `{mnEo�o u u BOARD OF HEALTH STAMPS 0 0 0 0 0 .. o R)r 00000oG000 PLAN SCALErn = 30, TYPICAL LEACHING FIELD X-SECTION Not To Scale TOP OF FOUNDATION ELEV.= I'Cs. l2 BOARD OF HEALTH STAMPS 1332 tmlN) is Z.3 WED 131' 5b�YUN1 �/ 0 ' - Ile - /2 WASHED STONE - 4 40 P C ° uaom Load. O O C C o o e e a, e 2 1¢ 1 -�' 190,70. P. MP ALIN Isp.zo `SxOF SUBSURFACE SEWAGE DISPI]SAL SYSTEM x a- P.vc. snNrtarr THes—� IA Opp 00 ('o 6 -3/4' 1 1/2" WASHED STONE 00oOo s3�luoo r� O 0 O 0-'G ,>"OOO'-O'O"O b O O i _ Lr)Df8E, 6v3 4' min. IBo 40 00000000000"O ., 00000000000000 D000000 O'00bb000000 pZIN EFA = ❑WNER:. THOMAS ST PIERRE 1500 GALLON , 1so. r l U'O O -O O O O O IZq,'10 g GVI s> r3aaa o o 0 0 0 0 0 0 0 o N srszs ASSESSORS MAP 60 LOT 1 37 SU LOT 118 %- PRECAST CONCRETE SEPTIC TANK ` re1.39 / ys) =i 'gafNrcrslca`�GSWUI '. L DISTRIBUTION BOX '--- --- --- ssrD STREET LOCATIDN _MELISSA LYNN DRIVER EL t2770 II—_ 11 I LEVEL STABLE BASE _ _-1c_L:. iZB z'* crr4lr o=Exc4vA'TroN --=_ : G'Orl'eia S. Lng"i7L28'M2?29' Inc. iiiiiiiiiiie 5 CRUSHED STONE ON MECHANICALLY COMPACTED LEVEL STABLE BASE RL STAMP4 8 Cnnvutt Street ust spsmarpc " u C/VS;ACWRNAfNC So¢Ue Da 0874�*8(4 th. dfA. rIimama u (dal) 9BS-I06Y SScar P (O S TYP@CAL PPOFILE OF A SEWAGE DISPOSAL SYSTEM .cosmata Scar PUNS P tee8) B%-COBS d$-BV6T e/I,YS JaeepA E. Corvaa DJ Pnv a A: VIP. 1 _-_�Ve IZ5 -7 DATE-.6/ 96 , NOTE -null to scale. _ WF:6 every attempt has been ads to avoid takes, the maker cannot gunraniee a aff t h error, the contractor nust ver+fy au deneosons and all prior to any construction CONTACT PERSON: JOSEP h - R Any conflicts shall be brought to .the attention of CORREIA'S ENGINEERING INC prior ko.Fonstrugtlon or excavation, t r