SPRINKLER RENO & ADDITION PLAN6" VIKING MODEL F-2 DRY PIPE VALVE (GI FACTORY
INSTALL VER➢GAL CONSTANT PRESSURE ALARM TRIM.
- A P07M PS40-PA PRESSURE SWITCH LOW PRESSURE)
- A POTTER PSIO-21 PRESSURE SWITCH AURM SWITCH)
SYSTEM CAPACITY IS APPROXIMATELY 390 GALLONS
B' EXPRESS F
4F FIRELOCK SERI
CHECK VALVE
7 MAIN DRAIN TO TERMIN
OUTSIDE WITH A GALVANIZI
AND WALL PLATE.
LEGEND
BLOWER AMD-1 AIR MAINTENANCE SPACE.
DRY SPRINKLER RISER GENERAL BLOWER TANK MOUNTED AIR COMPRESSOR. PROVIDED AND INSTALLED BY
THETO BE COMPLETED BY OTHERS. SIZED IN ACCORDANCE
SPRINKLER CWIRING """" R.
-Q= 070' 6 CLDI (+23)
-Q 350' 6° CLDI
-Q = 115' 6" CLDI (+2')
HIRE SERVICE
FLED BY OTHERS
HYDRANT FLOW TEST INFORMATION
-- - TIME: 10:40 A.M.
DATE: 10/17/2016
- ' 9AM-67 PSI
RESIDUAL-56 PSI
_ FLOW=1118 GPM
SITE PLAN
i
SCALE: Ve =20'
IUIL09G (USE TOP BEAM HANGERS)
THIS ROOM IS MARKED °UN —HEATED°.
HOWEVER, THIS ROOM WILL NOW BE
HEATED TO ALLOW FOR THE WE SYSTEM,
STORAGE ROOMS DETAIL
RAE NOTES.
YSTEIF & (1) WE SYSTEMS. THE DRY SYSTEM SHALL PROTECT THE
3UILDNG.
FANDARD RESPONSE SPRINKLERS SHALL BE USED ON THE DRY SYSTEM.
PIPE WITH GROOVED ENDS AND GROOVED
40 FLACK STEEL PIPE WITH THREADED ENDS AND
PIPE WITH GROOVED ENDS AND GROOVED
40 SLACK STEEL PIPE WITH THREADED ENDS AND
TATE BUILDING CODE 780 CMR 9th EDITION, NEZA 13-2013
tAL MEMBERS UNDER OBSTRUCTED OBSTRUCTION.
T A' PER 10' OF PIPE AND THE SPRINKLER
AGE DOORS AND OTHER OBSTRUCTIONS OVER 4'-0" WIDE.
VmJI IV Inc URINAL NUIGLU N A LAUR 45' ELBOW AND WALL PLATE.
11. ALL SECTIONS OF PIPING SHAM HAVE AUXILIARY DRAINS, SIZED IN ACCCRDANCE WITH NEU 13.