BP-74440COMMERCIAL
SECTION'11 ~= ESTIMATED`CONSTRUCTION COST,' , ..
-
Item Estimated Cost ($) to be completed by permit applicant
1. Building
2. Electrical
3. Plumbing
4. Mechanical (HVAC)
5. Off -Street Parking
6. Total = 0 + 2 + 3 + 4 + 5) Estimated Total Cost Including Labor: $
Y SECTTJONA2A OWNER AUTHORIZATION
., {tci`tie Completed whei owner`s agent or cbr tractor" ajsplies'for'bu tdrng perrrtrt) - z
(Please Print)
I, as Owner of the subject property hereby authorize
to act on my bAlf, in all matters relative to work authorized b this building permit application.
Sig11 nature o Owner Date
SECTION 1213 'OMNERIAU7FiORIZEDAGENT,:DECLARATION
Rap 64CZ;(Z as Owner/Authorized Agent hereby declare that the statements and information
on the foregoing application are true and accurate, to the best of my knowledge and belief.
Signed uAderpe pains and pen Ities f perjury.
ignalLid of Owner/Aut orize Ag Date
".OFFICEANSPECTOR`S NOTES ,
`..,. .
Less Application Fee: $2StT0� Remaining "" pp Balance:
Total Permit Fee: $
Other $ Amount $
Gross Area - New Construction total sq. ft.
Gross Area - Alteration to s ft.
Permit Issued to:^-��
Page 4
G�
r
Debris Removal
per lVIGL C.40 Sec. 54
rayc rMfdVISCU IV/ I I
The following descriptions are based on the Massachusetts State Building 8th Edition, Code Article 3, as noted. See the Code.
restaurant, lounge, theater, school, etc. (see Code Section 303.0)
fl Assembly re 9 _
Describe:
❑ Business -office, assembly with less then 50 occupants - indicate Medical or other professional (see Code Section 304.00)
o Education - struction for training including child day care for those over 2 year 9 months (see Code Section 305.0)
1 d Factory/Industrial (see Code Section 366.0)
o High Hazard (see Code Section 307.0)
❑ Institutional - hospital, nursing home, infant day care (see Code Section 308.0)
❑ Mercantile - retail stores (see Code Section 309.0)
❑ Residential -three or more family, hotel (see Code Section 310.0)
❑ Storage - including garage (see Code 311.0)
❑ Utility & Miscellaneous Structures - includes tents and agricultural structures (see Code Section 312.0)
❑ New Tenant - for any of the above, please indicate (see Code Section 105.1)
❑ Trailer - temporary
Purpose?
❑ Other:
Describe the proposal, INCLUDE number of dwelling units and bedrooms or occupant load as applicable, also existing
condition (if extra space is needed, attach an additional sheet):
❑ New construction and/or Additional (total gross cubic feet proposed) - indicate
If the project is an addition to existing structure - total gross square feet of existing:
❑ Alteration of existing, no increase in gross square feet. A separate Refuse Disposal Declaration is required.
Will this project be subject to CONSTRUCTION CONTROL (over 35,000 cu. ft.) ❑ Yes ❑ No
If Yes, see Code Section 107.6.2 Designer to submit Code Synopsis in additional to original plans and if existing building Chapter 34.
❑ Demolition* - describe structure:
❑ Trench Permit Required? ❑ Yes []No See Trench Requirements G.L.C. 82A and 520 CMR 7.00 et seq.
❑ Moving* - (provide copy of DPW moving license)
*Type of structure: from where (map/lot or address):
to where (mapnot or address): number of dwelling units:
number of bedrooms per dwelling unit:
❑ Replacement doors and windows - (for existing only) (only where doors and windows exist and will not be enlarged))
EGRESS dimensions must be maintained.
❑ Temporary structure and uses - includes, when allowed, new tenants, trailers, tents and the like and only for limited!'periods of time.
Describe:
,S1_CIION B-MECHANICA:&'RIIIhARY
❑ Furnace (hot air) - fuel gas (natural or propane), fuel oil, electricity, other (specify):
❑ Boiler (heating) - fuel gas. (natural or propane), fuel oil, electricity, other (specify):
❑ HVAC (combined unit) - primary fuel, natural gas, propane, electricity, other (specify):
❑ Air conditioning - (separate unit) Roof Top Unit (RTU) New ❑ Replacement ❑
❑ None of the above to be provided Mechanical Ventilation ❑
❑ Hot Water: Gas Electric Fuel Oil Other
SECTION 9 SPRINKI I=RS.ANDIOR.FIRE PROTECTION - COPIES'.OF PLANS AND NARRATIVE REQUIRED,\,
❑ Required: plans provided plans not provided, why?
❑ Not required, not to be installed, why? Narrative'Submitteril? ❑Yes ❑ No
:SECTION .10=tDENTIFICATION
11.1/4rchitect/Engineer for overall design
}/Company Name: L- ^I� �'
Address: r NoA.r "b N 17'f
Phone #: 6
Certified by State of Massachusetts as: �15ly t ;5
Certification Number:
Note: Signatures and seals on all plans, affidavits & other documents SHALL BE originals and not reproductions.
11.2 ArchitectlEngineer - project supervision and reports
Company Name:
Address:
Phone #:
Certified by State of Massachusetts as:
Certification Number:
Note: Signatures and seals on all plans affidavits &other documents SHALL BE originals and not reproductions.
3 General Contractor
N J�tV
Company Name:
Address: ^' L
Phone #: _
Construction Supervisors License Number: on % h_
Note: Signatures and seals on all plans, affidavits & other documents SHALL BE originals and not reproductions.
Page 3
Page 2
r-
r
t
r ...1
IN SUSP ACOUS C TILE
E CEILING
,-
I
L ,
I
f
f
[ ? t,
7tF R: • )r 3 7
Ir. ,
,.
1
t
n
rl..,r !
I
-t ,aa. ux l r
C-�NEWra �
1
1 NST L
,
r ,
,
•
ra
,
I r .. • . .,... ...
REMAIN
IS TI NG [)b
Em
op, TO REM ? t. .,
EX 1
,S -
r.
• I ,
,
I` I
T , _
.' EX ISTIN G WALL TOREMAIN
r
1,
I
I f1ED a
BE DEMOL S
EXISTING -WALL TO
a
f
1aT�—
I i
T DS
16
O.C.
A U METAL S
8 M
3 5/ @ I
r ..
: a
II ..
5/8r7WFi FA. SInF _ 1
W/.
i
3 5 8 METAL STUDS @
G O.C: ,
PLAN OF NEW
2 -
8II GWB EA, SIDE I _1�... .•_.. ' m
ul
� .• � ..__.....-- � � CLEAN ROOM
M, 1
,r%
M SYMBOLS
FIRE ALAS v .� •. � . a)V,
� I 8
•tC
ECTION SIGN
® EXIT SIGN WITH DIP
F Ca :
F-SNCY LIGHT :!, 1 ., �►€..
EMERGE � iF 11
m TM4 r.
HORN STRO j; I C atr.--
4��.I `�'...-..•S,� r...._. ._ ..�.........._ . _ ._........ .
r,
- , t.r „m a � � 2,r r 2ka• �r ~.m a ea fat f,.f la e+n In,,r«.I 14 a roa .Y.1 w a fa If>0 a m V � � I
STROBE
� Vi �•h4 CH � .:� er. _ � �• • • f _:. rsb H..r �,� �r e' —•I � 167,
ra�v
lP ULL STATION � _...,,.. ••. �
}--=� ', '_"` :, o+ Iru yr r� i ' O �' 3 i r 7fl �—
� I F
1
PLAN SYMBOLS
a o-011Ct r I 7Ar, I feu U
f f _ a •itry
_ r•`I
2 ry
-,
11 i
: t
i - _..__....... __ Z
v.
�� r
_ .•. .:. rot •t ® - ; ,.'\\ zD
} f
I r
CLEAN
r: tie_..B
I 9Lu
O M
a
O 1• !
..-• a � .a�Uh AF�A
S
c'
■
, � 1
CL
U
INSTALL WYN
� �
`C IN r tCC
ME
Vii> ._
: � r
3
rr
+Manta t
( n
CLEAN � , .� . , _ ., 1
2 j L—
i ROOM
2alnt 2rq Ht mna
:..........•... +.- I _ L-I'm PTA
< r i ,
� i
S
.600
- — . _ _ _
_ _ _ i • A,ai� 1H - _
G� O r • 7
JL 4[ rrlp M ts#Ltlli I , ,f7N.—C f
• r� �lr
i ,
Q
r O — - --- i
_ . ---- - -
a
g1tII-- 1
r
J a •� r :.� ! t rr-r�,t"> � 9-.._—.._ �-._...=-L.::::•r:•,:� � � _ lr-rl� 1 ��I I 'ZrJI 8° f ,
Drawn By
Aulhor
Checked By
Ghecker
Project Issue
RCVISIOnS
8/ 5/2014
NEW CLEAN
OOM
ROOM
t
N
DEMO EXISTING AS
4
ti
SHOW .
ri
29 SF
1837 SF
Drawn Dy iuthar
Checked
n PLAN SYMBOLS By Gh-�r
r.
A. DEMOLITION
NOTES.
C. PARTITION NO
TES:
OTE SG. MECHANICAL
C A C L
' `
'
NOTES _
,
,
.._,..
..:�,
_ ,
....�.
_-
.Y .q
_ ELEPHONE.NOTE. New wails sh IIbe constructed as in cated oI This is selective demolition. Perform cuttin9demolition and bY methods,whichwillprevent nthewaII tYpeIe end on thenew I: Exis in9sYstemde users and ductwork will be relocated, with newductwo k difus rs Installation of visCoordinatedsma9 e to other portions of the buII m 9which are t remaen an as noteded below. eswIIIbedonebYthLandlordsvinder.con rofsandeq ipment as re ui e by layout
t th. work of contractwe h theTenant.
..
,>
:
the r f n` Inswithinea ao t finish floorin ban an sus e Bed cei i e demolition ti n ,, Remove xis ine de I o 2. Re e e 2. II t Walls shall n t`
o be supported tfabrication� edb h I r -
e ceI In id. Wal
ls s shall be braced
a at_- .
9 p 9ed corners , 90 Hers an t
pp Y d o 2. All 9 i -.
9 des n " an n t di sail t a I n
o shall b n_
e i accordance
co n da c wi
th he 9 . , e It
t f r-'
d Ion
t th moll I n floor lan: Work indicated on e de o wostructure` t minimum ' above a f aointervals. 8
p
:oftNational_. .
h B e O CA L: F, Cod e andfE ASH ELE _ RACTRI f AL r r C NOTE , o aI u It S F ae and m material qu
ality
'
'
-
4. ` :
.specificat
io
ns. Useex experienced
Ienced ins
tallers. all s. ProvIdeproduct sofa acceptable table man c'
t ur rs -
I :
AIIdu du
plex receptacles acl es shall b em oun teda t8
�above� t h e fl0or
t o
cent t l in e ofbo
x unle
ss Remove all exist in9 walls, doors, and other items shown dashed on the pan and as otherwisewIe 3. finish face panel trim an Ies with th o ereprperJoint com ound sYst m. `which have been in satisfactory torYuse m similar service for eeYea s. Deliver, handle and I`�erwise noted onpan. All hei9hts are to centerline f box above flrequlred to complete the new work of this project. oorstore materials in accordance with manufacturers instructions.tructIons. Sheet metalalwork and
Reinforce all
__..
.,._..
..., _ .. -
' -.v rtic l and horizontal nt aI exterior
rior
partiti
on and soff t' corn
ers r swith eta corne
r
r
:-
:
S
pacCessorIes h ll compIYwIthSMACNADuctMa Manual d hee MetaCon truc Construction 2ace abo
ve c Ilin9
is
are urn air
p Ie um . All
electrical, ctr I ca
te
lephone,
e
h on e c
m
p ut
r and ot
her r4 Most existio9 II ht fixtures and ceitIn9 supply and return diffusers are tobira sed. Save all 'bead. Ed es of drywall which materialshall have metalI ed 9e trim. Ventilatin 9 and Air Conditi n in9S stems. werin9 shall comply with theNational Electric Codefixturesfor r use re9a din9 wIrIn9InaIr_hand1o9spaces
and
,
environmental
o nt
5 Repair all n r t
e al air spaces. es: _
e exis I Im r e e e walls all in
terior r r t e Io wall to
re o ma
in, ain column enclosures,
osu te
nant n t p e an 9 , _ 3. h _.. T e contractor
o actor shall coordinate
dins a all mechanical Wo
rk t k with th r ewokofall t -
o her trade-5. ade .
r t
5
I ht fir ho ro t f t` t n m r" nc al pack I sand e s be unI selective. Removal o exis in xi si s e e e w s Is s c Iv m 5e e e e. de isin II n corridor
n/ Walls and co I o II r d walls as requ
ired ed for pr
oper er application
f Yo new int r _.
9 9 9 p 9e Ior #meshes. 9 q {' pLocate m e mechanical t a s s ems t 3. o avoid interface
e ac t IPr
e with lot t ovld li a ion of other t e a necessai Y systems. ems: Not labor i and materials
to Ials Y which r Y a r
Notify e re
quired u i ed n conj
unction t cI on wi
th h th
e
ew r rt t r r I I lit q work. r r to t n u o moat one a r Fire alarm devices are o remain connected a be s ed e e wire from J
Y
pp p 9 99
r , A Architect t t I c pr
ior I rt f 0 o construction tr ` r• o s t o .. uc Ion f o conflicts t on Ic s which other
is cannot t trades
a no b r e ades e esolved: as required r p i ed for tom I t e installation
_ i s allat ion q f o fir
e r u s p e si onand_ .
the ceilin above. ` Construct
pp
e 6 Cons uc ne
w sum board c ilin s n e and soffits. as Indicated in the reflected
e elect 9 ed ceilin plan' 9Yp 9 a
h e� t 9 p rn co_I o in and
x a t , U 5 .' s t s em'
9 9
s.
tI -
�� Y
u Iizin 2I2 t x 25 a i metal t e studs an / s d r 5 8 GWB. Brace
c horizontal ; e o Iz nt / o al studs t structure
d o s ucture a 9 9 9 boys 4. Site conditions shall determine r e e mine the actual arran ement of systems.
9
Take field
h r within wall n„
All l receptacles n oth r 1 tr I vices ich a i i a d ceilin' t G. duplex and e electrical Ica de w e w s o be : t intervals p9
a in a vain no rester than 4 .
9 measurements before r eo fabrication. .I e ab Ic t 4 �� a ion. BeB re
sponsible es on Pr sib) for [Provide
e o accuracy Ids h lit a cu t ac of switches F dimension this as In s and la o t indicated _.:. u . d n t .,..
p o he Y 9 an t a 4 8 a .. boy f Y e to r 0 n i a d t dI P on t to switch
- t tch
r t strip back n I` shall removed, n I rn Ii i n o above ceilin s i ck o nearest t demolished s a be e oved, i cud a w l es junction 9 9 9 p
J
Ov rh e aductwork e d' 1 shall be laid t on
d out to obtain the latch maximum headroom. side of th d oom.e door f o eachoffice.
breakers.
box or circuit panel and make safe. Lock out appropriate b sake s. b e . All new walls shall b constructed
7 a e cans ct m u ed plumb level with pw a maximum deviation from p o true lane
p ..
of 8 in 1O. 5: Test an
d d balance ac I e al t 5. systems em for
s o pr
o r eo'rt e a i n Ct'r o . S t ovI ubml de n a bal n new r a cm r em Y e rt t e enc 0 o th I lit n p i p e p exit
x sI ns and fire
9 p 9 Y i e alarm
v 9 9 e ices a .__
9
s indicat ed o n the
If r n affected demolition hall rendered matte r t r e life
7: All electrical we I and devices a ec ed b de o s beinactive o o he wise
9 Y
per
fFo sa t
plans.
r t r t I r after demolition.
Y
p
harmless o persons in he but din du in '. and a e de I ion. - `
- p 9 9 D.IN INTERIOR FINISH NOTES
-. Acoustical Ceie Ti
les: Ies
G. Restore dams e f d Inishe5. I G 9Clean and protect
o ect work from �fh k om dama e Electrical Information 9 e o ,anon Plan is P.O.
B a r Box
ox stet6587
onl
y. I . Electrical
ec rical d evic
9 es are t Y ob econsidered m tt t r tr sa h . Remove all lumbin fixtures shown dashed a he exis in es oo and showers. r . Remove
8 x es e s a ove all
p 9 Pr n r 9 ovide ew Id and tiles to match I t ex s in where noted on the new reflected m n Houston MA
9 ceilin ;, i Ilmum tenant ro I z46
9e uirements. It is the r 9 e es onsib I t II q ft o h contractor e t o pens r Yu t
l I I b
e hat th e
t It these r tr m n c below nab n below t f i in assoaa ed with ess es oo sad a e ow w h finish floor
Overhead e ooV 774 233 0176
pp 9 p p 9 p Ian: Existm c it t e in tiles which. are not stained or otherwise is p e w e dama ed shall be reused. 7.Ven ro er o eration f II uai 9 9 g fy p o a exhausts terns. ntit and t es of electrl p p Ys q Y cal devices ` Yp anels transf transformer o ern etc. are
install www. i p , installed In accordance cl ntondesi n:com
line:
Rework ri 5 t
co Banc e
9
d s ern in areas In c ` t -
di a ed on -the reflected ceilin
Y Ian: Provide new tiles an wit)'
9 d ,� the latest t 9 p edition of the Natio
nal Electric Code as amended by
52
7 CMR 1 2. 00 and
_ r :
t m Id o match t ac eisl r x n as required for
e ed o a tom I t e e ceilin system. REEF ' 9 R TO ENGINEERING D to
9 q p Y G DRAWINGS AND SPECIFICATIONS tithe satisfaction
9 ONS-FOR ADDITIONAL INFO on of the local whin INFORMATION ens ector.
r completion f th
9 p
9: The contractor shall broom clean. the entire floor area upon tom e o e demolition work. -
p p
r hell removed from th ` t properly s f. ,
All debris -shall be e oved o s n o e disposed o de e site and y
p p p 2. Paint.
H. FIRE SUPPRESSION SYSTEM NO
TES: 7ke air all li lit fixture p g s as re uired for proper operation. Clean
n lenses. Replace dama ed
II
p
9
A new and existin sum wallboard
d shall. receive Sherwin WilliamsPromar 200 late I ..Mode an t lent
9 9 latex, Modify d_ex end existin service to accommodate new work. I es. Replace burn lamps lamps of
9 Re locate existin heads p p p an odd color:
full c l n tiles which r not ma are to b reused.
9
10. F eI iI are da ed e
9e sh Il finish t 9e .Ines paint, rimer on n n r g new and bare surfaces and two finish. coats on new an 9 p p w d existin =as required for new system. Proved g q y e new heads to match existin as required.
9
surfaces,' __
`color to b e.se ected.
REF"
ER TO
ENGINEE
RING D RA WIN G5 AND SP
ECIFICATIONS
C IFI
CATION S FOR AD
DITIONAL
IT ION A L INF
O O RMATIO
- I I .Save all fire extin ueshers and cabinets for reuse. N
9
2. Contractor
ac or shall provide a tom I t n t p e e l sailed and tested s stem.
All i tin n
p Y
ex s a ne
w ew hollow. metal door frames and hollow metal al doors shall receive
t n :
thermostats r n c ed a d laced ab t A n sensors s half remain cone o 2. Exec in HV Cand e s e above suspended p _
9P , Sherwin Williams r m r P o a 200 seine loss sent rimer on new and bare surfaces 3. t g paint, p su aces and two finish Maintain fire alarm system in operation Burin construction.
Y
r t r' t in r temporarily r tstructurev
p 9Z
ceilin c o o otherwise a o a I secured o above.
9 p Ycoats on new and exis t" _
in ,
9 surfaces:
_ 4. Coordinate the Tenants ro
om uses to
pr
ovide
yid e adequate
esystem
mfor
all contract are
as..r all HVAC intakes with filters prir to be9innin9 demolition. Cove
O
All t ,
exis in perimeter sum board soffits and all new and existin interior soffits
---
_ r
9 P 9Yp g e for so its
th h ou o t the ` u e space shall t t a be painted o match wall paint. 9 5: Coordinate location
p p p a ion of fire protection systems to avoid interference`
. Th t n tenants in the adjacent spaces will b orlon urin normal business hours. Provide
p with location of '
4 s e a J pa e w g d g P vide
deli nated li htin fixture locations. Notify Architect prior t 9 90 o construct 9fi' Ion of conflicts
c t t
P
temporary barricades, t r nsimilar r r to ac ens o h ern o a ba icades a s and devices as required ed keep e adjacent space Q
p rY pq p J p Sand and seal all doors with three coats of satin finish polyurethane, sandin between which can not be resolved.
-
n t keep the adjacent space clear of construction dust and debris.
- p Yu g ved . '
and o p J p coats. --�
G. Comply with
p y we overnin codes and re ulations: Provide products
9 9 9 p s of acts table
r required en t t lim t t h rin br in n p
5. Provide equi ed rnclud g, but no limited o, s o g, ac g and support to
pp 3. Carpet: p manufacturers .which have been in satisfactory use
_ ry e in similar service for three ears: Use
maintain structural ante rit of the work:
Y
9 Y Carpet installation shall be in accordance with the Carpet and Ru p p g Institute "Specifiers experienced Installers. Deliver, handle and store materials in accordance with
Handbook and .manufacturers written instructions.- manufacturers
u acturers Instructions:
V J
B: GENERAL NOTES:
4. Vinyl Base:.:
Yl 7. Site conditions shall determine the
actual arrangement of runs, bends, offsets and similar
Verify all dimensions shown on the Ian and note Architect of an discre anaes prior to Q
fY t' notify Y p
Provide vinyl base on all walls. Johnsonete 4 x 1/8 vinyl, stral ht at carpet areas and Items. Take field measurements before '
t 9 p fabrication: Be responsible for accuracy of _
construction of partitions.
cove base at all areas with vinyl floor tile, color to be selected. dimensions and layout. Overhead i' in shall b la
r
Y p p g e Id out to obtain maximum headroom:
r access doors it n c elin required forelectrical,n 2. P ovide a es d s in walls and e gas equl ed o mechanical and/or plumbing ,
5.Vin
YI Floor Tile: 8. Provide complete s rinkler c r cove a e per NFPA 13:
and similar items. Location of access doors must be confirmed with Architect prior to installati p p 9
e p on. Reuse existing vinyl floor the wherever possible: New vinyl tale when required Shall be
a �
i 2 x 12 x 1/8 . Arm5trond Standard Exceion vinyl tiles.Colorto be selected. 9. Coordinate with work of other trades.O
3. Provide fire retardant treated wood blocking in walls as required to properly attach counters, O
t
cabinets, shelvin and similar items.
9 _
G. Provide vinyl reduce strips
y _ ng s ips at all floor finish transitions. REFER TO ENGINEERING- - O
DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION
4. Contractor shall field verify all finish to finish wall dimensions prior to f�.�rication of casework I. FIRE
ty
p 7: Repair all existing finishes damaged by new work. ALARM SYSTEM NOTES.
m and similar items. I . Contractor shall provide a complete t p p to installed and tested system.
E. DOOR AND FRAME NOTES: Q
.All stin r t exi doors noted to remain or be relocated shall be repaired required
t f h s hall b installed in strict accordance with and over substrates 9 d as for proper 5. All produc s and Ines e s e a es pp p 2. Maintain fire alarm
``
system in operation
Ion Burin9 construction.
prepared accordance with manufacturers f ctur rs written instructions. All interior floor, wall and ceiling operation andauniform appearance. AIso refer to interiorfinish and hardware notes.
Q
,
r t II I r I flame a classification. ific ion. finished shall have a class I o class A a e spread d a s a
( ) 3. Coordinate p the Tenants room uses to provide adequate system
- � � ��p q Ys ern for all contract areas. LU
2. New flush wood doors shall be 3 x 7 1 .75 soled core lain sliced oakveneer. p Provide
vision panels of 14 tempered lass at door t
G. Drawin sure not to be used individual) but only as an entire set of dr wen s. p / p g s noted. Refer to door elevations:
9 Y Y � 9 4. Coordinate location of fire alarm systems to avoid interference with location _ Y o of ( l
Beni n t
V
g a ed le htin fixture locations. Note Architect rior to construction
9 9 Notify ons ucteon of conflicts `
3. Undercut all doors as required b new floor
p
7. All safetyre ulations are to be strict) followed. Methods of construction and erection of q y e oo finishes. Also undercut doors to
9 y �which can not be resolved.
allow for 1-1/2", clears space t bottom .
structural materials is the contractors responsibility. p e a bo om of doors for :proper operation of exhaust systems.
p Y
5. Comply -
C I with overnin codes an p Y g g d regulations. Provide products of acceptable
4. Re -seal ed es of all doors which have finish remove urin installation.
p p
8. The contractor 15 res on5eble for dissemination of all revisions and requirements to the 9 d d g i s allation.
p , q manufacturers which have been in satisfactory use in similar service for three years. Use
-subcontractors.-
experienced installers
. Deliver, handle and store materials In accordance with
5. Provide KD HM frames for all new doors.
manufacturers instructions.
f r n and 9. Reasonable care has been. taken in the preparation o a all d awe gs a d specifications. However,
F.:DOOR HARDWARE NOTES.. -
frh
the Architect and En sneer do not uarantee a airst human error and o that reason it is
- 9 9 9 -_I . Hines: G. Provide complete fire alarm system covers a per NFPA 72.
that the contractor shall check all dimensions and details and must verify II conditions
9 9
imperative e fy a condl io s Provide 1- I /2 air of hin es per leaf, at all new r "
and dimensions at the bueldin. All discrepancies shall be brou ht to the attention of the Architect
p 9 p doors, Stanely F 179, 4.5 x 4.5 or ;
9 p 9 equal Provide ball bearin hen es at all doors with closer's (EBB 179 . 7. Coordinate with work of other trades:
p 9 `.
before roceedin : 9 9 )
-
2. L c t 8. All strobe devices must be synchronized.
o kse s/Passage Sets: Yn
10. The contractor shall submit shop drawinrj5 for review before roceeding with fabrication a` nd/or
Provide Von Du rin ore ual ush bar exit device with alarm f at r
installation of millwork, casework, toilet partitions, doors, frames, hardware, Iumbrn fixtures,
p q p s u e and disabling key N.
p p 9 at REFER TO ENGINEERING DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION
electrical equipment, mechanical equipment, fire alarm and fire protection equipment and similar
p
items and equipment. 3: Floor Stops:.J. PLUMBING NOTES:
Drawn By /iufhor
Checked By Ghc% -r
. Provide all iumbin , includin supply, waste and vent r
All doors shall have floor sto s. Provide Ives 436 dome stop as required. p 9 9 pp Y, s squired in conjunction with the
. Fire stopall new floor penetrations and penetrations throw h rated walls. An exitin -
p p q
p p 9 Y 9 ,plumbing work outlined. Project issue 7114114
non-firesto ed penetrations uncovered b demolition or new work must also be fire stopped. pp p Y peed. 4. Silencers:08/05/2014
Revisions
2. Coordinate At II frames e location of plumbin systems to avoid interference with location
a amen -Ives or equal. 9 Ion of structure
and other bueldin systems. Comply with overnin codes and r
9 Y pY 9 9 egulations.
5. All hardware on existin door t g s o remain or relocated shall be repaired as required for
3. Restore dama ed finishes. Clean and protect work from uniform appearance and proper operation. 9 p o damage.
4.M
G. Finish of all new hardware shall match existin . Modify and extend existing water and waste service to accommodate new work. Remo
ve
ove
existing systems and piping no longer required.
7. Provide flush bolts on inactive leaf of new double doors.
- 5. Pro
vide piumbing systems components and all required accessories includin shut-off
s ,. Q b.'-'•-�- •--•----.n -i'- - _, , ,. nnA Aant -niif-c, Prninw
IL,V