Loading...
Order of Conditions 310 C.MR 10.99 • DEP bile No. I 15— 1 109 • (To be provided by DEP) • Form 5 atyfrown Dartmouth Applicant T-i ot-hy L. Medeirog commonwealth of Massachusetts - Order of Conditions Massachuetts Wetlands Protection Act G.L. a. 131, 540 and the Dartmouth Wetlands Protection Bylaw From Dartmouth Conservation Commission Issuing Authority To Timothy L. Medeiros same as applicant 79(Na ee oApplicant) (Name of property owner) 1 Reed Road same Address No_ Dartsrrnith, MA 02747 Address This Order is issued and delivered as follows: ❑ by hand delivery to applicant or representative on (date) XE] by certified mail, return receipt requested on July 20, 1994 (date) This project is located at MaP 79, lot 6-4, Medeiros Lane The property is recorded at the Registry of Bristol Book 3308 Page 165 certificate (if registered) The Notice of Intent for this project was filed on 7/11/94 (date) The public hearing was closed on July 19, 1994 (date) Findings The Conservation Commission has reviewed the above-referenced Notice of Intent and plans and has i held a public hearing on the project. Based on the information available to the Commssion at this time, the Cnmmi s Sinn has determined that the area on which the proposed work is to be done is significant to the following interests in accordance with the Presumptions of Significance set forth in the regulations for each Area Subject to Protection Under the Act (check as appropriate): Public water supply n Flood Control Q Land containing shellfish Private water supply Storm damage prevention $$�� Fisheries Ground water supply '.. Prevention of pollution Protection of Wildife Habitat c� Total Filing Fee Submitted $250.00 State Share $112.50 - ' (1/2 fee in excess of S255— .73 N I-;j cp City/Town Share $137.50 - cn 771 Total Refund Due S —0— City/Town Portion S • -0_ State Portic S r-�-1 (1/2 total) • (1/2 total)C ; o C-, c ca r o rn O -o 71 Effective 11/10/89 5-1 Timothy L. Medeiros ORDER OF CONDITIONS - Continued: FILE NO. 15- 1109 Therefore, the Commission hereby finds that the following conditions are necessary, in accordance with the Performance standards set forth in the regulations, to protect those interests check above. The Commission orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. General Conditions 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: (a) the work is a maintenance dredging project as provided for in the Act; or (b) the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance and both that date and the special circumstances warranting the extended time period are set forth in this order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or part of any of the foregoing. 7. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Final order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of the recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be submitted to the Commission on the form at the end of this Order prior to commencement of the work. 9. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection, File Number 15- 1109 10. Where the Department of Environmental Protection is requested to make a determination and to issue a superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 11. Upon completion of the work described herein, the applicant shall forthwith request in writing that a Certificate of Compliance be issued stating that the work has been satisfactorily completed. 5-2 . Timothy L. Medeiros • ORDER OF CONDITIONS - Continued: FILE NO. 15- 1109 12. The work shall conform to the following plans and special conditions: Plans: Title Dated Signed and stamped by: Rev. 6/16/94 John J. McKinnon "Subsurface Sewage Disposal System" The above plans are on file with the Dartmouth Conservation Commission. Special Conditions (Use additional paper if necessary) 13. Prior to the start of construction the following must occur: a - The holder(s) of the Order of Conditions or their representative shall notify the Conservation Commission office of the starting date of construction. Unless specifically indicated to the contrary by the Commission or its agent, an on-site meeting between the Conservation Officer, the contractor, and the holder of this Order of Conditions, shall take place on site prior to the star of work. b - All siltation control measures shall be installed prior to any excavation or tree stump removal. The siltation control measures shall be approved by the Conservation Officer prior to any other activity on site. c - When deemed necessary by the Conservation commission or its agent, the applicant shall have on hand, at the start of any soil disturbance, removal, or stock-piling, a minimum of fifty (50) hay bales and sufficient stakes for securing these bales. Said bales shall be used only for the control of emergency erosion problems„ and shall not be used for the normal control of erosion. d - This Order of Conditions shall be recorded within fifteen (15) days of receipt in accordance with Condition #8. e - The name and telephone number of a contact person in charge of activity on site shall be submitted to the Conservation Commission. 14. No activity shall occur prior to obtaining all necessary and required permits, licenses, and approvals, and until copies of the same have been furnished to the Conservation Commission. 1,, 15. Any design modifications, alterations, amendments, or additions. to he approved Plan of Record, which fall within. the jurisdiction of the Cons 'rvattion_z commission, shall be subject to the approval of the Commission:. gque is for any changes shall be made in writing, and shall be accompanied-by QnWo i?Z) revised plans. 16. No modification of surface features, drainage or-topography sign -be- permitted, except as indicated by this Order of Conditions. f-= c) o 17. Contours shall remain unchanged except as permitted by this Omercq Conditions. -II 18. There shall be no construction other than that proposed by the Notice of Intent and included on the submitted plan. 19. Immediately upon completion of the exterior construction, grading and landscaping shall be carried out in order to minimize erosion. 20. All wetlands and Buffer Zone areas shall be kept clear of rubbish, debris and construction material. 5-3A TimothyL. Medeiros ORDER OF CNDITIONS - Continued: FILE NO. 15- 1109 21. All exposed soil or subsoil shall be stabilized using mulch or other appropriate erosion control measures such as jute netting, and/or replanted with vegetation such as grass, ground cover or shrubs so as to minimize erosion and siltation. 22. No runoff shall be caused to drain onto adjoining property or upon any public way. 23. All excavated material not used to establish final grading shall be removed from the site. 24. The Inspector and/or the Commission members shall, at a reasonable time, have the right to enter upon the land for the purpose of the inspection and/or the taking of pictures. 25. When the Plan of Record has been prepared and stamped by a Registered Engineer, a Registered engineer shall certify, in writing, that the project has been completed in accordance with the above Order of Conditions before the Certificate of Compliance will be issued. 26. All facilities and equipment shall be continually operated and maintained so as to comply with this Order of Conditions and M.G.L. , C 131, S40, the Wetlands Protection Act. 27. certain conditions, such as maintenance or monitoring, are on-going and do not expire at the end of three years, or with the issuance of a Certificate of Compliance. 28. This Order of Conditions shall apply to any successor in interest of the applicant, or successor in control of the property. The applicant shall furnish a copy of this Order to any subsequent owner at the time that ownership is transferred. 29. Any changes required by any other board or authority may require a new filing with the conservation Commission. 30. The Conservation Commission and/or the Town of Dartmouth shall not be responsible or liable for the construction, the operation, or the maintenance of any part of this project, and does not warrant the safety of the same. 31. During construction, any fill and/or construction materials shall be stored in upland areas. 32. If changes to the approved plan-of-record on file with the Dartmouth Conservation commission are required by other regulatory agencies, any such changes shall be submitted for approval in accordance with Conditions #14 of this Order of Conditions. 33. Any construction in the flood plain shall conform to the Massachusetts Building Code, 780 C.M.R. , S2102, the Design Requirements for Construction in Floodplains. 34. It shall be the responsibility of the applicant or the applicant s representative to continuously maintain all siltation barriers required by this order of Conditions until the commission approves or requires removal of said barriers. 35. Unless alternate erosion/siltation control measures have been approved by the Conservation Commission or its agent, all exposed soils exceeding a 4:1 slope shall be stabilized using erosion control blanket/netting within 48 hours of soil disturbance, and shall remain in place for the duration of the project, or until vegetation has been re-established. 36. Any soils exposed by construction activity or disturbed in any other manner shall be, upon completion of construction, immediately stabilized with indigenous vegetation. Plantings may include, but not limited to grass seed mixture for approved lawn areas, indigenous shrub and tree species, or indigenous herbaceous cover species. All plantings shall be approved by the Dartmouth Conservation Officer. 5-3B Timothy L. Medeiros ORDER OF CONDITIONS - Continued: FILE NO. 15- 1109 37. Once plantings become established, all hay bale silt fence and snow fencing, or any combination thereof required by this order of Conditions shall be, upon approval of the Conservation Officer, immediately removed. 38. The Commission reserves the right to require additional protective measures for the resource areas should a site visit indicate the necessity for those additional measures. 39. Unless alternate erosion/siltation control measures have been approved by the Conservation Commission or its agent, all exposed soils exceeding a 4:1 slope shall be stabilized using erosion control blanket/netting within 48 hours of soil disturbance, and shall remain in place for the duration of the project, or until vegetation has been re-established. 40. Any soils exposed by construction activity or disturbed in another manner shall be, upon completion of construction, immediately stabilized with indigenous vegetation. Plantings may include, but not limited to grass seed mixture for approved lawn areas, indigenous shrub and tree :species, or indigenous herbaceous cover species. All plantings shall be approved by the Dartmouth Conservation Officer. 41. Once plantings become established, all hay bale silt fence and snow fencing, or any combination thereof required by this order of Conditions shall be, upon approval of the Conservation Officer, immediately removed. 42. The Commission reserves the right to require additional protective measures for the resource areas should a site visit indicate the necessity for those additional measures. N rn C c:. +'r7 C) O o GJ 7-1 5-3C Timothy L. Medeiros ORDER OF CONDITIONS - Continued: FILE NO. 15- 1109 Issued By the D- youth Con erva(ti n ommission Si nature(s)_*.1 _twv,,, i,6, 411111fretr, icee -14,% ,'";%%;;]:0-k!:: This Order must be signed by a majority of the Conservation Commission. On this 19th day of July 19 94 , before me personally appeared Gerald Franklin , to me know to be the person described in and who executed the foregoing instrument and acknowledged that he/she executed the same as his/her free act and deed. i/e0V'e/i: 6/28/96 Notary Public Rita Costa My Commission Expires The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land upon which the proposed work is to be done, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the Department of Environmental Protection to issue a Superseding Order, provided the request is made by certified mail or hand delivery to the Department, with the appropriate filing fee and Fee Transmittal Form as provided in 310 Clot 10.03(7), within ten days from the date of issuance of this determination. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and the applicant. This Order of Conditions, unless specifically indicated to the contrary, is issued pursuant to both the Massachusetts Wetlands Protection Act and the Dartmouth Wetlands Protection Bylaw. Therefore, in addition to the appeal process specified above for the appeal of an Order of Conditions issued pursuant to the Massachusetts Wetlands Protection Act, any person aggrieved by this Order may also appeal this Order of Conditions in accordance with Section 1.08 of the Dartmouth Wetlands Protection Bylaw. Detach on dotted line and submit to the Conservation Commission prior to commencement of work. To the Dartmouth Conservation Commission Issuing Authority Please be advised that the Order of Conditions for the project at File Number 15-1109 has been recorded at the Registry of Bristol, book ,page has been noted in the chain of title of the affected property in accordance with General Condition 8 on ,19 . If recorded land, the instrument number which identifies this transaction is If registered Land, the document number which identifies this transaction is signature Applicant 5-4A